Shadow Analysis & Structure Design for Solar Power Plant
Importance of shadow analysis and structure design in solar power plants: Shadow Analysis Report Solar power plants must be in a 100% shadow-free area to get optimum generation. So while designing the solar power plant, we need to consider the sun position throughout the year and our site location azimuth. Read more…