
MORE ABOUT US
Importance of Solar Pre-design
We believe that solar is for everyone, whether you are residential solar, commercial, or industrial solar. No permits i.e., CEI drawing approval, would be needed if you are going to install an off-grid solar PV system or grid-connected system for captive (self) consumption. Only for net metering and gross metering system, certain permits and approvals are required, and CEI drawings are needed. Let’s see what’s CEI approval drawings works.

