Solar Design Samples

Browse real design samples across residential, commercial, and utility-scale solar projects, and see our engineering quality first-hand

PORTFOLIO SAMPLES

See the Quality Before You Engage

We offer sample design packages for every project type, so you know what you're getting before you place an order. Each sample reflects our real production output.

Download All Samples
Residential Solar Design

5 kW Plant with Battery

5 kW On-Grid + Battery Backup | Single-phase | Residential Rooftop

SLD3D LayoutPVsystBOQ
Request Sample

27.36 kW with Micro Inverters

27.36 kW | Micro Inverter Configuration | Commercial Rooftop

SLDString LayoutShading AnalysisEquipment Schedule
Request Sample

16 kW with Two Inverters

16 kW | Dual Inverter | Residential / Small Commercial

SLDCable LayoutEarthingPVsyst Report
Request Sample
Commercial Solar Design

130 kW Commercial

130 kW | Industrial Rooftop | 3-Phase Grid Tied

SLDCEIG DrawingStructural LoadCable Schedule
Request Sample

200 kW Commercial

200 kW | Large Commercial Rooftop | HT Connected

SLDCEIGStructuralPVsystBOQ
Request Sample
Utility-Scale Solar Design

2,000 kW Ground Mount Plant

2 MWp | Utility Scale | Ground Mount with DC/AC Cable Trenching

SLDGA DrawingSTAAD ProCivil LayoutStringingBOQ
Request Sample

OUR SERVICES

Samples Available for Every Service

Samples are available for every service category, so you can check the deliverable before you order.

Download Samples Now
Solar 3D Pre-Design
Solar Post-Design
Solar Rooftop Detailed Engineering
Solar Ground Mount Design
MW Scale Project Management
Solar Civil & Structural Engineering
Site Survey & Land Feasibility
Solar Permit Design
CEIG Drawings
STAAD Pro Reports

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.