Reports

Engineering reports for informed project decisions

Engineering Reports We Deliver

Heaven Designs prepares engineering reports that support approvals, client presentations and construction. To check a yield report yourself, read our guides to bankable PVsyst reports, P50, P90 and P99 yield figures and reading a PVsyst loss diagram.

📊

PVsyst Energy Simulation Report

Detailed energy production forecasts, performance ratio analysis, loss breakdown, and shading analysis for solar projects.

☀️

Shading Analysis Report

3D shading simulations with hourly/monthly analysis, near-shading objects impact, and optimization recommendations.

💰

ROI & Financial Projection Report

Financial analysis including LCOE, payback period, IRR, and 25-year cash flow projections.

🏗️

Geo-Technical Report

Soil bearing capacity, soil classification, foundation recommendations, and geo-technical analysis for solar sites.

⚡

Earth Resistivity Report

Soil resistivity testing for grounding system design, Wenner 4-pin method measurements, and grounding recommendations.

🔩

STAAD Pro Structural Report

Structural analysis reports for solar mounting structures including load calculations, stress analysis, and safety factors.

Need a Custom Report?

Contact our team to discuss your specific reporting requirements. We tailor reports to AHJ, lender and client requirements. Structural reports are covered in detail on our STAAD Pro reports page, and site reports on site survey and land feasibility.

Contact Us

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.