Site Survey & Land Feasibility Services
Site survey and land feasibility services for solar projects across India.
SURVEY SERVICES
Site Survey & Land Feasibility Services
Heaven Designs provides solar site survey and land feasibility services across India. Our surveyors use GPS and total station equipment to deliver accurate topographic data, soil analysis, and feasibility reports essential for solar project planning.
Request a Survey
WHAT WE COVER
Survey and Feasibility Services
Contour Mapping Surveys Across India
Professional topographic surveys using advanced GPS and total station equipment. Generates accurate contour maps essential for solar farm layout design and grading plans.
Soil Test, Earth Resistivity & Geo-Technical Reports
Soil testing, earth resistivity measurements, and geo-technical reports to support foundation design for solar structures.
Our Gallery
HOW IT WORKS
How a Solar Site Survey Feeds the Design
Survey data is the input every later drawing depends on. Errors here show up later as redesigns, foundation changes or yield shortfalls, so we scope each survey around what the design will need.
- Topography: contour maps from GPS and total station surveys, used for array layout and grading plans.
- Soil: soil tests and geotechnical reports that set the foundation type and depth.
- Earthing: earth resistivity readings used to design the earthing system.
- Feasibility: site observations on access, obstructions and usable area that inform the go or no-go decision.
Further reading: solar site surveys in India, how a solar feasibility study works, the drone survey guide for solar projects, site survey vs satellite-based design and land lease vs purchase for solar.
Related services: solar ground mount design, solar civil and structural engineering and solar engineering reports.
, Industries we serve
Built for every building type
Solar design and engineering for residential, commercial, industrial, utility-scale, and institutional projects worldwide.
FAQ
Frequently asked questions
What does a site survey package include?
Do you provide soil testing and geo-technical reports?
Where do you operate surveys?
Why is survey quality important?
How do survey outputs feed design?
Ready for constructible design packages?
Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.