Solar Design and MEP BIM Services

Two verticals under one engineering partner: solar design for EPCs, and MEP design & BIM for AEC teams and property owners.

WHAT WE OFFER

Services by category

Browse solar engineering, MEP design, and BIM services, organized the way AEC buyers shop. US installers can start from our solar design services for the USA, or find a state or country on the locations page.

Category

Solar Design Services

Permit packages, 3D design, detailed engineering, civil/structural, surveys, and PMC for EPCs worldwide.

Solar 3D Pre-Design

Solar 3D Pre-Design

3D layouts, shading analysis, and energy estimates for proposals.

Read More →
Solar Post-Design

Solar Post-Design

Detailed engineering after concept approval.

Read More →
Rooftop Detailed Engineering

Rooftop Detailed Engineering

Detailed engineering packages for rooftop solar projects.

Read More →
Ground Mount Design

Ground Mount Design

Utility-scale ground mount design with terrain analysis.

Read More →
Solar Permit Design

Solar Permit Design

US/Canada residential and commercial solar permit plan sets.

Read More →
Civil & Structural Engineering

Civil & Structural Engineering

STAAD Pro structural analysis and foundation design for solar.

Read More →
Site Survey & Feasibility

Site Survey & Feasibility

Contour mapping, soil testing, and geo-technical reports.

Read More →
MW Scale Project Management

MW Scale Project Management

End-to-end project management consultancy for MW-scale solar.

Read More →
Electrical CEIG Drawings

Electrical CEIG Drawings

SLDs, equipment specs, and CEIG approval drawings.

Read More →

Category

MEP Design Services

Mechanical / HVAC, electrical, plumbing, and fire protection design with coordinated Revit models.

MEP hub →
Mechanical Design

Mechanical Design

Code-aware HVAC and hydronic design with coordinated Revit models, from load calcs to construction-ready sheets.

Read More →
Electrical Design

Electrical Design

Power, lighting, and distribution design coordinated in BIM: clear panels, circuits, and constructible layout packages.

Read More →
Plumbing Design

Plumbing Design

Domestic water, drainage, and pump-room design modeled in 3D as clear, buildable plumbing packages.

Read More →
Fire Protection Design

Fire Protection Design

Sprinkler systems, fire pump rooms, and risers designed and modeled for coordination and installation.

Read More →

Category

BIM Services

MEP BIM modeling, CAD/PDF to Revit, clash detection, and Revit family creation.

BIM hub →
MEP BIM Services

MEP BIM Services

Multi-discipline MEP models in Revit: accurate systems, clean coordination and construction-ready sheets.

Read More →
CAD / PDF to BIM

CAD / PDF to BIM

Turn 2D drawings into usable Revit models: the first step toward coordination and modern delivery.

Read More →
Clash Detection & Coordination

Clash Detection & Coordination

Clash detection services for design firms and contractors: find and fix conflicts between trades in 3D for fewer RFIs, cleaner installs and coordinated models.

Read More →
Revit Family Creation

Revit Family Creation

Custom Revit families for equipment and components: accurate, parametric, and project-ready.

Read More →

Why Heaven Designs?

50+
Engineers
300+
EPC Clients Served
102+ MW
Designed Globally
M·E·P·F
Plus Solar Vertical

, Industries we serve

Built for every building type

Solar and MEP/BIM services across residential, commercial, industrial, healthcare, hospitality, aviation, and more.

Residential
Commercial
Restaurant
Highrise Buildings
Healthcare
Educational institutions
Hospitality
Industrial
Aviation
Data Center
Solar EPCs AEC firms Greenfield Brownfield Revit MEP AutoCAD

FAQ

Services FAQs

What services does Heaven Designs offer?
Two verticals: solar design and engineering for EPCs (permit design, 3D pre-design, detailed engineering, PMC, and more), plus MEP design and BIM for AEC teams and property owners.
Who are your typical clients?
Solar EPCs and installers worldwide, plus architects, general contractors, subcontractors, consultants, developers, and property owners who need constructible design and BIM packages.
Where are you based and where do you deliver?
We are based in Surat and Ahmedabad, Gujarat, India, and deliver packages for projects across 15+ countries.
What is your typical turnaround?
Turnaround is agreed at scoping and depends on complexity. MEP/BIM timelines are scoped at kickoff based on building size and LOD.
Do you support both greenfield and brownfield projects?
Yes. New builds, renovations, fit-outs, and 2D-to-BIM rebuilds are all supported under the right service line.
How do I get a quote?
Use the contact form, call, or WhatsApp. Include service type, location, and any drawings you have for the fastest response.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.