Heaven Designs

Things You Need To Keep In Mind Before Choosing Solar Products

Solar Energy is elevating fast into today’s energy market, so do products which comprises up a solar system. In order to guide you in choosing the right solar products for your solar system, we have enlisted some of the major points which when taken into consideration before going solar can help in the long run of the solar system.

Quality Of Solar Products

The solar products in the prevailing markets have found an entry of cheap and low-quality solar products. And, the investors who have invested in the solar products featured with low-quality solar design finds that their solar pv design breaks down quickly, often after only a couple of months use, which results in loss of energy and most importantly, trust. Fortunately, the energy access and solar design industry has matured enough and there is an importation of high-quality solar products into the emerging markets, detailed solar system designs and engineering has helped in changing the consumer perception of solar products.

Solar PV Systems Are Consistent In Cutting Energy Costs

The solar systems when properly installed backed up with great solar pv design can be more dependable than utility companies. Off-grid solar systems are immune to power outages as there are no moving parts on solar systems; they are likely to be more reliable. The solar pv systems can be consistent if the right designing and solar engineering consultants are approached for the proper engineering, structuring and designing of the solar system.

Maintenance Of Solar Products 

Solar panels demands maintenance even though they are stationary. Frequent cleaning and dusting of the solar panels to prevent the blocking of the sun’s rays would help. Apart from this, getting in touch with a good solar company will give you a warranty of between 15 and 25 years. As well as guarantee that the energy production of your panels remains at 85% or above for that entire time. 

Busting myths associated with solar energy and its generation is necessary. Which would create a change in perspectives and also will help in maintaining the trust for solar. In addition to the above, Heaven Designs presents some tips for choosing the right solar panels.

Four Top Tips for Choosing Solar Panels

Solar energy has innumerable benefits to offer consumers but, given that you’re here, we believe you’re already more than familiar with them. Having assessed your options and researched up their advantages, you now find yourself thinking of switching to clean energy source but you’re not quite sure how to select the perfect panels or the perfect solar design company. If we both are working along the right lines so far, we bet you’ve come to the right place. Heaven Designs, the best solar system designing company is about to give you four top tips to guide your decision-making.

Consider Your Costs

Whilst cost shouldn’t be the ideal factor that guides your choice of choosing a solar company for solar panel, but it’s an important consideration for most people. Few of us want to dig the pockets for the purposes of switching to solar energy and, luckily, you don’t have to. Like any other sector, the solar energy industry is a competitive one and there are tons of options out there to choose from. All one has to do is to have a look for the right company rather than the persuading offers as dozens of different deals are showered for sale. Therefore, try to go for a company that provides you all the solar solutions under one roof, like Heaven Designs who effectively covers from on grid solar system design to large scale solar MW projects. The reason of choosing one company for all is consistency in work and cost-effectiveness.

Assess Their Energy Efficiency

Another thing to think about is how energy efficient the panels or the designs you paid for are. The energy efficiency indicates how much of the light received by the solar panels is converted into electrical energy, so the higher the value, the better is the energy efficiency.

Pay Attention To The Temperature Coefficient

Temperature coefficient relates to the impact heat has on a solar panel’s operational efficiency. Following installation and the lower the number, the better is the efficiency. The reason for this is simple: overheating accelerates ageing of the solar panels. Most importantly, if you want something that will last, keep an eye for the lowest percentage per degree Celsius.

Watch Out For Long-Term Warranties

Lastly, we suggest you look for solar companies which offer solar panels that are as durable as possible. However, if a long warranty period is not included as standard warranty, then take this as a warning sign, and no matter how good and budget friendly the price is, keep on searching until you find something better.

Consider & Follow The Above Four Top Tips To Find The Perfect Solar Panels For You.

Download Our Official Mobile Application ‘Solar Design Solution’ & Get Your Solar Projects In Your Hand.

IOS App:

Android App:

Website:
Email:     

Follow Us On:

Scroll to Top