
MORE ABOUT US
Importance of Solar Pre-design
As solar power installations began to grow across the world, the requirement of solar pre-design is also increasing day by day. Also, manufacturers rushed to produce the panels and materials needed to generate renewable electricity. Therefore, India expanded solar-generation capacity eight times from 2,650 MW (megawatt) on 26 May 2014 to over 20 GW (Gigawatts) as of 31 January 2018.





