Electrical (CEIG) Drawings

MORE ABOUT US

Importance of Solar Pre-design

As solar power installations began to grow across the world, the requirement of solar pre-design is also increasing day by day. Also, manufacturers rushed to produce the panels and materials needed to generate renewable electricity. Therefore, India expanded solar-generation capacity eight times from 2,650 MW (megawatt) on 26 May 2014 to over 20 GW (Gigawatts) as of 31 January 2018.

WORK

Electrical (CEIG) Drawings

Single Line Diagram Sample

Equipment Layout Sample

Earthing Layout sample

General Arrangement Sample

WORK

Basic Solar Pre-Design

3D Realistic Site Design

Panel Placement

Capacity find out

Advance Shadow Analysis

3D Tentative Structure Design

PVsyst Power Generation report

360 Degree BirdEye view Video

Structure BOM Calculation

Scroll to Top