Project Management Consultancy
End-to-end solar project management, from site survey and feasibility to engineering design, approvals, and on-site execution support
PMC SERVICES
Optimised Solar Design for Megawatt-Scale Plants
A thorough site survey, area utilisation and load calculations, and a virtual simulation of the plant form the foundation of a well-performing megawatt-scale solar project. Our team handles feasibility assessments, government approvals, and statutory compliance paperwork.
We help EPC clients reduce project cost with optimised solar design, from the first site visit to final handover documentation.
Site Survey & Feasibility
Virtual simulation and on-site data collection to assess area utilisation and load calculations for optimal plant performance.
Engineering Design
Complete drawing package covering electrical, structural, civil, and layout drawings for project execution.
Government Approvals
Handling DISCOM, CEIG, and statutory compliance paperwork for smooth regulatory clearance.
Execution Support
On-site consultancy support during construction, including component guidance and real-time query resolution.
DELIVERABLES
Management Consultancy Package
A PMC engagement can include a complete engineering and documentation package covering project design and execution.
Single Line Diagram
Complete electrical SLD from panels to grid connection, covering AC/DC sides, protection relays, and metering.
Cable Layout
DC and AC cable routing plans with cable sizing, conduit paths, and junction box placement across the entire site.
Earthing Layout
Full earthing network design per IS standards, including GI strip mesh, electrode locations, and bonding connections.
Bill of Quantity (BOQ)
Material and equipment list with specifications, makes, quantities, and unit rates for procurement.
Foundation Layout for GI Structure
Pile and footing layout drawing for GI module mounting structures, with dimensions and anchor details.
Module Mounting Structure Assembly
Detailed MMS assembly drawings including rafter, purlin, post, and clamp configurations for rooftop or ground mount.
Component & Spec Matching
Verification of equipment specs (panels, inverters, transformers and cables) against the project design requirements.
Shadow Analysis & Area Diagram
Site-specific shadow analysis showing inter-row shading, near-field obstructions, and optimised array layout.
300+
EPC Companies Served
50+
Engineers on the Team
102+ MW
Solar Capacity Designed
15+
Countries Covered
HOW PMC WORKS
What Solar PMC Services Cover
Design-only work ends when the drawings are issued. Solar PMC carries the same engineering team through approvals and construction, so site queries are answered by the people who drew the plant.
- Before design: site survey, area utilisation and load study, and a simulated yield for the proposed layout.
- During design: SLD, cable and earthing layouts, BOQ, foundation and mounting structure drawings, and shadow analysis.
- Approvals: DISCOM, CEIG and statutory paperwork prepared and tracked.
- On site: component checks against the design and answers to construction queries as they come up.
If you are deciding whether to outsource, compare PMC services against an in-house project team. Our bid-stage engineering checklist, the guide to how design delays hit project cash flow and the solar plant commissioning checklist cover the stages PMC manages.
For utility-scale programmes, see MW-scale project management consultancy. Related services include site survey and land feasibility and electrical CEIG drawings.