One Stop Solution For Solar Design,
Engineering & Consultancy!

Solar design service

Easy Steps to Get Solar Design

Step 1

Upload site survey data

Log in to Dashboard and upload your site survey data for an optimal solar design  through our mobile app or through the website.

Step 2

Get suitable solar design solution

We will allocate you experienced solar engineering consultants and will design your project as per your need.

Step 3

Monitor Your Solar Design Project Progress

You can monitor your project progress in our customized solar design dashboard. You can also chat or call to our solar engineering consultants.

Step 4

Download Your Solar Design

You can download and view any of your Solar Design like- Solar PV Design, Solar Structure Design, On Grid Solar System Design and other Solar Plant Layouts / Drawings anytime for free.

What We Have Done So Far?

0
B2B Customers
0
MW Detailed Solar Design
0
MW Solar Pre-design

Grow Your Solar Business

Convert Lead into Business!

  • Get your 3D solar walk through video with
    advance Shadow Analysis.
  • Know exact site capacity for solar power plant
  • 100% shadow free installation
  • Impress your customer with a unique solar system design presentation
  • Get Pvsyst power generation report
  • Get steel weight and solar structure design
Solar power plant design
single line diagram solar

Detailed On-grid Solar System Design

  • Single Line Diagram
  • ACDB/ DCDB / Solar LT Panel Design
  • General arrangement layout
  • DC / AC Cable Layout
  • Earthing/ Lightning Arrester layout
  • AC Cable Sizing and Loss calculations
  • Solar PV Design/ Layout
  • CEI approval drawings set

Solar Structure Design & Wind Analysis.

  • Get Staad Pro report for structure strength and wind analysis
  • Get customized solar design for industries and commercial complex
  • Ground mounted solar structure design as per countour mapping & soil test report 
  • Detailed Fabrication drawings
photo of solar structure design
MW sacle solar design

Get MW Scale Solar Design & Consultancy!

  • Get Complete Electrical & Civil Drawings Set
  • Get detailed project report (DPR)
  • Get ACDB/ LT and HT panel designs
  • Transformer selection and feeding point diagrams
  • Get Complete BOM and end to end consultancy 

Checkout Our Latest App

FAQ

Most frequent questions and answers
  1. Heaven’s Solar Design charges are very nominal.
  2. you can hire us on monthly basis. Check out our services package.
  3. You can also pay us per project design basis.
  4. Contact us to get quotation. 

  1. Sign-up on our portal on website or through our mobile app and upload the site survey data.
  2. Our technical team will analyze the data and will provide suitable solutions.
  3. You can monitor the project progress and solar designs provided by us.
  4. Download your project from portal.
  1. Very basic data like google location, 2D site survey layout and site video.
  2. You can fill solar site survey form from our mobile app or Online through website.

Shadow analysis is 97% accurate; we consider location of the solar plant on earth and shortest day and longest day of the year which helps to produce more accurate results

  1. While providing you with a solar system design, we focus on max. power generation, better quality and cost optimization.
  2. We have done almost all type of solar design projects from on-grid solar system design to complete solar power plant designing with our team of experienced solar engineering consultants which helps us to create WIN-WIN situation for everyone.
  3. You can focus on business development and new EPC project leads, we will provide you spectacular solar design and engineering support. This way your business will grow faster.

We help our customers to prepare very unique Solar presentation for their customers.

  • You can easily impress your customer with Heaven’s 3D designs & drawings.
  • Our 3D Solar Designs helps you to become a unique solar brand.
  • We focus on reducing solar project cost & maximizing the power generation.
  1. Pre-design is specially design to close your solar leads.
  2. Pre- solar design also helps you to finding our exact site capacity & accurate shadow analysis.
  3. We provide complete BOM of structure with pre-design. So you can quote more accurately to customers.
  4.  Pre-design also includes power generation reports.

We check quality of Solar panel by looking at solar cell datasheet and technical parameters of the Inverter. And as per site condition we calculate the string size, cable size which helps to harvest maximum energy from solar power plant. Electrical solar design will give you to understand solar power plant technical parameters in detail.

An appropriate Solar Structure Design will sustain in extreme situations. While designing the structure we consider parameters like stability, durability & cost. And we keep balance between all three.

We are committed to keep your project confidentiality and will sign the agreement for it.

Customer Reviews

I am very much impressed by the unique Service of team Heaven. Heaven's Solar 3D design was so effective. It helped to impress the customer and close the lead. We
Mr. Kuldeep Sorathiya
Ksquare Energy
We worked with Team Heaven one of the tender of PGVCL solar residential project. We received Shadow analysis reports & Structure certificate very quickly. Go for Heaven' Designs.
Mr. Ankit Mangukiya
Flame Solren
For detailed solar design engineering, we always go to Heaven Designs. We have very good coordination with team Heaven. Team has designed more than 2 MW solar project across the Gujarat
Mr. Sharvil Dave
Gelson Corporate

©Heaven Designs Pvt Ltd. All Right Reserved.

Our customer support team is here to answer your questions. Ask us anything!