Solar Civil & Structural Engineering

Structural analysis and civil engineering for rooftop and ground-mount solar projects.

CIVIL & STRUCTURAL

Solar Civil & Structural Engineering

Heaven Designs provides civil and structural engineering for solar installations. Using STAAD Pro and standard code-based methods, our engineers deliver safe, cost-optimized structural designs for rooftop and ground-mount projects.

Get Engineering Support
Solar Civil and Structural Engineering

Engineering Services

STAAD Pro Analysis

Advanced structural analysis using STAAD Pro for solar mounting structures and foundations

Foundation Design

Pile, raft, and isolated footing designs for solar structures across varying soil conditions

PEB Structure Design

Pre-engineered building design for inverter rooms, control rooms, and equipment shelters

MS/GI Structure

Mild steel and galvanized iron mounting structure design for rooftop and ground-mount systems

HOW IT WORKS

How Solar Structural Engineering Fits Your Project

Structural work decides whether an array can be built where the layout puts it. We scope it around the structure type and the loads the site will see.

  • Rooftop: roof load checks for RCC and metal sheet roofs, mounting structure design, and anchor or ballast details.
  • Ground mount: pile, raft or isolated footing design based on the soil data available.
  • Loads and codes: wind, dead and seismic loads (plus snow where relevant) to IS 875 and IS 1893 in India, or ASCE 7 on US projects, as confirmed at kickoff.
  • Buildings: PEB inverter rooms, control rooms and equipment shelters.

Further reading: solar structural engineering in India, how to choose a solar mounting structure, the tin shed solar design guide, ASCE wind loads for solar and SAP2000 vs STAAD vs manual calculation.

Related services: STAAD Pro reports and calculations, solar ground mount design and site survey and land feasibility.

, Industries we serve

Built for every building type

Solar design and engineering for residential, commercial, industrial, utility-scale, and institutional projects worldwide.

Residential rooftop
Commercial & industrial
Utility-scale ground mount
Warehouses & factories
Schools & campuses
Hospitals & clinics
Hospitality
Government & public
Agri / rural solar
Hybrid / BESS-ready
Rooftop Ground mount Permit packages Detailed engineering

FAQ

Frequently asked questions

What structural services do you provide for solar?
Foundation design, structure analysis (including STAAD Pro), PEB/MS/GI structure calculations, and related civil packages.
Do you design for rooftop and ground mount?
Yes. Structural packages cover both rooftop mounting systems and ground-mount foundations as scoped.
What wind and snow codes do you follow?
We design to the project’s specified codes and standards (for example ASCE-based criteria in US markets) confirmed at kickoff.
Can structural work ship with electrical drawings?
Yes. Many EPC packages combine civil/structural with electrical and layout drawings.
What inputs are required?
Site data, structure type, load criteria, soil notes when available, and array layout assumptions.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.