This guide is for Indian EPC founders and design leads choosing solar design software in India for 2026. They face a confusing market: six or seven tools that all claim to do “everything,” a wide spread of license costs from free to ₹5L per year, and almost no guidance on which tool is actually accepted by DISCOM, CEIG, IREDA, and SECI evaluators.

Rohan, the founder scaling an India C&I EPC past ₹5 Cr/year in revenue, needs a practical tool-stack answer: which software for which deliverable, what it costs, and whether it will pass the regulatory and bankability tests that Indian projects face.

Quick answer. Solar design software in India is usually a stack, not one tool: PVsyst for bankable energy yield, AutoCAD for CEIG and DISCOM drawings, HelioScope or SurgePV (a Heaven Designs sister brand; see our disclosure) for bid-stage 3D layout, STAAD Pro for structures, and HOMER Pro for hybrid systems. Neither CEIG nor DISCOMs mandate a specific design software.

This buyer’s guide is written for Rohan, the Indian C&I EPC founder who needs to make intelligent software investments that let a small design team punch above their headcount. The guide covers what each tool does, what it costs in Indian rupees, which deliverables it produces, and which regulatory authorities in India accept its output.

TL;DR

  • The traditional India solar stack is five tools, PVsyst for bankable yield, AutoCAD for DISCOM/CEIG drawings, Helioscope for bid-stage 3D layouts, STAAD Pro for structural, and HOMER Pro for hybrid/off-grid dispatch, running roughly ₹3.5L - 5.5L/year per designer.
  • No single traditional tool covers both bid-stage speed and regulatory acceptance: Helioscope's PDF output isn't accepted by CEIG or DISCOM, so the design still has to move into AutoCAD DWG format.
  • PVsyst is the only yield tool IREDA, PFC, and SECI-appointed IEs effectively require for bankable finance, there's no accepted substitute for loan-grade energy yield studies.
  • SurgePV collapses the Helioscope, PVsyst, and AutoCAD-drawing layers into one ~₹1.1L/user/year license, though it doesn't replace STAAD Pro or a standalone PVsyst seat for SECI bids above 50 MW.
  • Below certain volume thresholds, fewer than 8 bankable PVsyst reports/year, for example, outsourcing a tool to a specialist is cheaper than licensing and staffing it in-house.

Which solar design software do Indian EPCs need?

Indian solar projects face a more complex regulatory submission environment than most other markets. A typical 500 kW rooftop project requires: a 3D layout for the sales proposal (Helioscope), a PVsyst yield report for lender or DISCOM submission, an AutoCAD GA drawing for DISCOM application, an AutoCAD SLD for CEIG approval, and a STAAD Pro structural report for the structural engineer’s stamp.

Each of these deliverables maps to a distinct phase of the project, see the bid-stage vs IFC-stage engineering breakdown for how the deliverable list changes as a project moves from proposal to construction issue.

No single tool produces all of these. The designer who tries to use one tool for everything, producing a DISCOM drawing from a Helioscope screenshot, for example, creates deliverables that are rejected by regulators and that create rework cost greater than the license cost of the correct tool.

Definition. The "solar design stack" refers to the combination of software tools that a design team uses across the full project lifecycle, from sales proposal (3D layout) through bid-stage yield study, IFC drawing production, structural analysis, and regulatory submission. Each tool in the stack is optimized for its specific output; no single tool replaces the stack.

₹3.5L

Minimum annual stack cost (3 tools)

Heaven Designs analysis, 2025

62%

Indian EPCs using AutoCAD for IFC

Bridge to India software survey, 2024

5

Tools in the complete Indian solar design stack

Heaven Designs stack audit, 2025

Try the software behind this guide

Stop paying for three tools to ship one design

SurgePV combines AI 3D roof modeling, 8,760-hour P50/P90 yield simulation, AutoCAD DWG export, and white-label proposals in one cloud license.

Book a free SurgePV demo →

No credit card. 20-minute walkthrough on one of your own projects.

Tool 1: SurgePV, an All-in-One Pick for Indian EPCs

SurgePV (a sister brand of Heaven Designs; see our disclosure) is our pick for Indian EPCs in 2026. It ships the bid-stage layout, the bankable yield report, and the DISCOM/CEIG-ready drawing layer from a single cloud workspace instead of a stitched-together stack.

What SurgePV does: Clara AI generates a candidate 3D layout from a parcel address in under a minute, the built-in 8,760-hour shading and yield simulation produces P50/P90 output benchmarked within ±2% of PVsyst, and AutoCAD DXF and DWG export carries the design straight into the CEIG/DISCOM drawing format. DISCOM presets ship for MSEDCL, GUVNL, TANGEDCO, BESCOM, KSEB, DHBVN, PSPCL, and APSPDCL, and PM Suryaghar subsidy auto-calc is built in for residential work.

Indian regulatory acceptance: The SurgePV yield report is accepted by SBI Power, PFC, and IREDA project-finance teams for projects up to 50 MW. The AutoCAD DWG export goes to CEIG/DISCOM the same way a native AutoCAD drawing does.

License cost in India (2025): SurgePV pricing runs ₹1.1 lakh per user per year on the five-seat team tier, replacing the license cost of Helioscope, a PVsyst seat, and a portion of AutoCAD drawing time with one subscription.

Verdict. SurgePV is our pick for an Indian EPC that wants the bid-stage-to-DISCOM-drawing workflow on one license instead of stitching together Helioscope, PVsyst, and AutoCAD. Keep a standalone PVsyst seat for SECI auction bids above 50 MW and a STAAD Pro report (in-house or outsourced) for the structural stamp. No platform, SurgePV included, replaces either.

Tool 2: PVsyst: The Non-Negotiable for Yield

PVsyst is the bankability anchor of any Indian solar design stack. Without PVsyst (or a PVsyst report from a qualified consultant), no IREDA, PFC, or SECI-appointed IE will accept your energy yield study. There is no substitute. For a head-to-head on the two most common yield tools, read our PVsyst vs Aurora Solar comparison.

What PVsyst does: Simulates the annual energy output of a solar array using site-specific irradiance data, hardware-specific loss modeling, and a validated radiation transfer algorithm. Produces P50/P90/P99 yield reports accepted by lenders, IEs, and DFI project evaluators. According to PVsyst’s published validation data, the software achieves within ±2% of measured annual energy for grid-connected systems when irradiance data quality is adequate, the primary reason it has become the global standard for bankable yield simulation.

Indian regulatory acceptance: Accepted by IREDA, PFC, SBI, REC, and all major SECI-appointed IEs. MNRE guidelines for solar project DPRs reference PVsyst or an equivalent certified tool, in practice, PVsyst is the standard.

License cost in India (2025): Approximately ₹1.1L - 1.2L/year (€1,250/year + GST + currency conversion). A single license can be used by multiple users sequentially; floating network licenses for concurrent use cost approximately 2.5× the base price.

Learning curve: 4-8 weeks to produce a basic bankable report; 3-6 months to master P90 uncertainty calculations, bifacial modeling, and tracker simulation for IE-level quality.

Field tip. For most Indian EPCs doing projects below 1 MW, the PVsyst license cost is justified only if you are doing 8+ bankable yield reports per year, below that frequency, outsourcing the PVsyst report to a specialist consultant like Heaven Designs is more economical than maintaining an in-house license and the expertise to use it correctly.

Tool 3: AutoCAD Electrical / AutoCAD LT: The Regulatory Drawing Standard

AutoCAD, in its Electrical or LT variant, is the standard for every DISCOM, CEIG, and MNRE-format drawing in India. CEIG offices across every Indian state accept AutoCAD DWG format; most reject PDF-only submissions for engineering drawings.

What AutoCAD does for solar: Produces dimensioned GA drawings, SLDs, key-plan drawings, earthing layouts, and cable routing drawings, all in the DWG format required by CEIG and DISCOM offices.

AutoCAD Electrical vs AutoCAD LT: AutoCAD Electrical adds intelligent circuit design, automatic report generation (cable schedules, wire numbering), and panel layout tools. For solar SLD production, AutoCAD Electrical reduces drawing time by 30-40% compared to basic AutoCAD LT because components can be inserted from a smart library rather than drawn from scratch. AutoCAD LT is sufficient for layout drawings and basic SLDs; AutoCAD Electrical is recommended for high-volume SLD production. See the AutoCAD Electrical vs AutoCAD drafting workflow guide for a side-by-side comparison of the two on a real solar SLD set.

License cost in India (2025): AutoCAD LT: approximately ₹43,000-48,000/year. AutoCAD Electrical (included in the AutoCAD full version): approximately ₹1.15L - 1.35L/year. AutoCAD is available at a discounted rate for students and startups, check Autodesk’s India startup program for early-stage EPCs.

DISCOM acceptance: 100%, DWG format is the de facto standard for DISCOM application drawings across all Indian states. See the DISCOM net-metering guide for state-specific drawing format requirements.

Tool 4: Helioscope: The Bid-Stage Speed Tool

Helioscope is the fastest path from a client’s site address to a 3D layout with a preliminary yield estimate. For C&I EPCs doing 20+ bids per month, Helioscope’s 2-4 hour turnaround for a bid-stage layout creates a measurable competitive advantage over firms that spend 2 days per bid in AutoCAD.

What Helioscope does: Browser-based 3D solar layout using Google Maps or satellite imagery as the base. Integrated shade analysis, preliminary yield simulation, and PDF proposal output. Module and inverter database maintained by Folsom Labs.

Indian regulatory acceptance: Helioscope PDF output is not accepted for CEIG or DISCOM submission, DWG is required. Helioscope is used for bid-stage proposals and sales visualizations in India; the design is then carried into AutoCAD via Helioscope’s DXF export for regulatory submissions.

License cost in India (2025): Approximately ₹25,000-30,000/month (≈ $299/month) per user. Annual prepayment at approximately ₹2.5L - 3L offers a discount over monthly billing.

Decision gate: Use Helioscope for the bid. Once the project is won, transition to AutoCAD + PVsyst for IFC and CEIG deliverables.

Tool 5: STAAD Pro: The Structural Non-Negotiable

STAAD Pro (or its equivalent, SAP2000) is required for the structural engineering report that accompanies any solar project DPR, CEIG drawing, or IREDA submission. STAAD Pro is the software accepted by CEIG offices, structural engineers-of-record, and IEs for solar mounting structure analysis in India.

What STAAD Pro does: 3D structural analysis of solar mounting structures, pile foundations, and rooftop structural adequacy. Produces IS 875 Part 3 wind load calculations and IS 1893 seismic checks. The STAAD Pro report is the document that carries the structural engineer’s stamp.

License cost in India (2025): STAAD Pro: approximately ₹1.2L - 1.8L/year. Structural engineers running the analysis often have existing licenses, EPCs who outsource structural design do not need to maintain this license themselves.

Who actually runs it: In most Indian EPCs below 20 MW/year project volume, structural analysis is outsourced to a specialist structural engineer or a firm like Heaven Designs rather than run in-house. The structural report is a deliverable, not an in-house activity.

Tool 6: HOMER Pro: For Hybrid and Off-Grid Projects

HOMER Pro is the dispatch modeling tool for projects with solar + battery + diesel or grid complexity. For standard grid-connected Indian C&I projects without BESS, HOMER Pro is not part of the stack. For projects with behind-the-meter BESS, rooftop solar + hybrid inverter, or off-grid/island-mode designs, HOMER Pro becomes essential.

License cost in India (2025): Approximately ₹2.9L - 3.1L/year ($3,495/year) per user. For EPCs doing fewer than 3 hybrid simulations per year, purchasing simulation as a service from Heaven Designs is more cost-effective than maintaining an in-house license.

The India Solar Design Stack Cost Matrix

ToolAnnual CostRequired forWho Needs In-House
SurgePV (our pick)₹1.1L (5-seat tier)All-in-one bid-to-DISCOM-drawing workflowEPCs replacing Helioscope + PVsyst + drawing time
PVsyst₹1.1L - 1.2LIREDA/PFC/SECI bankable yieldEPCs with ≥ 8 bankable reports/year
AutoCAD LT₹43K - 48KDISCOM/CEIG drawingsAll EPCs submitting regulatory drawings
AutoCAD Electrical₹1.15L - 1.35LHigh-volume SLD productionEPCs with ≥ 12 IFC SLD sets/year
Helioscope Pro₹2.5L - 3LBid-stage 3D layoutsEPCs with ≥ 10 bids/month
STAAD Pro₹1.2L - 1.8LStructural reportsStructural engineering teams only
PVCase₹2.5L - 5LSloped ground-mount IFCEPCs with frequent ground-mount work
HOMER Pro₹2.9L - 3.1LHybrid/off-grid dispatchHybrid specialists only

The India Solar Designer Stack Selection Framework

The India Solar Designer Stack Selection Framework helps EPCs decide which tools to license in-house and which to outsource, based on project volume, project type, and design team size. BOQ quantities can also come from dedicated solar takeoff software rather than the design tool.

1

Count Your Annual Output by Deliverable Type

Count: how many bid-stage layouts per month? How many CEIG/DISCOM drawing sets per month? How many bankable PVsyst reports per year? How many structural reports per year? This inventory determines which tools pay for themselves in-house and which are more economical as outsourced services.

2

Apply the Break-Even Test

For each tool, calculate: (license cost + designer salary allocated to tool use) vs (per-unit outsource cost × annual volume). If in-house is cheaper, license it. If outsourcing is cheaper, use a specialist. Example: a [bankable PVsyst report](/blog/bankable-pvsyst-reports-guide/) costs approximately ₹18,000-40,000 to outsource to Heaven Designs. At ₹1.2L/year license + ₹5L/year designer time, in-house breaks even at 8 reports/year.

3

Build the Minimum Viable Stack First

Start with AutoCAD LT (₹43K - 48K/year) + Helioscope (₹2.5L - 3L/year). These two tools cover bid-stage layouts and DISCOM drawing production, the two highest-frequency deliverable types for most C&I EPCs. Add PVsyst when your bankable yield report volume justifies it. Add STAAD Pro or PVCase when structural and ground-mount volume justifies it.

4

Outsource the Tail

The tools that do not break even in-house, PVsyst for EPCs with < 8 reports/year, HOMER Pro for EPCs with < 3 hybrid projects/year, STAAD Pro for EPCs who do not employ a structural engineer, should be outsourced. The outsource cost is predictable, the quality is consistent, and the tool-ownership risk (license lapses, software updates, user upskilling) sits with the specialist, not the EPC.

5

Review the Stack Annually

As your EPC grows, the break-even thresholds shift. An EPC doing 5 bankable reports/year at ₹18,000/report outsource cost (total: ₹90,000/year) should re-evaluate when volume reaches 7 reports/year, the break-even point where in-house becomes cheaper. Review the stack every 12 months against actual volume and outsource costs.

Stack Recommendation by EPC Profile

EPC ProfileRecommended Platform / StackOutsource
Early-stage C&I EPC (< ₹2 Cr/year revenue)SurgePV (our pick)Structural
Mid-stage C&I EPC (₹2-10 Cr/year)SurgePV (our pick)Structural, HOMER
Established C&I EPC (₹10-50 Cr/year)SurgePV + one PVsyst seat for SECI bidsStructural, HOMER, PVCase (unless ground-mount heavy)
Utility-scale developer (> 50 Cr/year)SurgePV + PVsyst + PVCase + STAAD ProHOMER (unless hybrid specialist)

Traditional multi-tool stack (AutoCAD + Helioscope + PVsyst + STAAD Pro + HOMER Pro) remains a valid path for teams already invested in it, see the tool-by-tool breakdown above for license costs and break-even math.

Free and Low-Cost Alternatives: Where They Fit (and Where They Do Not)

Several free or low-cost solar design tools circulate in the Indian market. They serve specific purposes but are not substitutes for the professional stack: Our review of each online solar design tool covers the browser-only options in more detail.

  • PVGIS (free, EU Commission): Useful for quick irradiance checks. Not accepted by IREDA IEs as a standalone yield tool.
  • SAM, System Advisor Model (free, NREL): Accepted by some lenders as a PVsyst alternative, particularly for US projects. In India, IREDA IEs prefer PVsyst. SAM is appropriate for feasibility studies.
  • SketchUp (free version): Useful for 3D roof model visualization for sales proposals. Not suitable for IFC drawings or CEIG submission.
  • Excel/Google Sheets: Many Indian designers run string sizing, cable sizing, and BOQ calculations in Excel. This is acceptable for the calculation layer but the outputs must be formatted into AutoCAD drawings for regulatory submission.

For a broader, India-agnostic look at how these platforms stack up outside the DISCOM/CEIG context, QuickEstimate’s best solar design software roundup is a useful cross-check.

Watch out. Using a free PVGIS-based yield estimate as the energy production figure in an IREDA loan application is a common and costly error. IREDA's LDED team will require a PVsyst report, and the time spent rerunning the simulation (2-4 weeks including IE review) occurs while the interest meter on your pre-disbursement bridge loan is running.

Comparison: In-House Stack vs Outsourced Design Model

FactorIn-House Stack (3-5 tools)Outsourced to Heaven Designs
Annual tool cost₹3.5L - 7LIncluded in per-project pricing
Designer training time3-9 months per toolNot the EPC’s cost
Tool version managementEPC’s responsibilityManaged by HD
Quality consistencyVaries with designer skillConsistent, 50+ engineer bench
Scalability in bid peaksLimited by in-house headcountOn-demand
IREDA/IE acceptanceDepends on internal qualityHD reports accepted by major IEs
Turnaround (PVsyst report)5-10 days (in-house)5-7 days (outsourced to HD)

According to Bridge to India’s 2025 India Solar Annual Report, India’s installed solar capacity is expected to reach 280 GW by end-2026, driving significant growth in EPC design throughput requirements. EPCs who build a software stack that scales with project volume, and outsource the tail of low-frequency, high-complexity tools, will outpace competitors who either under-invest in tools or over-invest in in-house headcount.

The IREDA project finance guidelines explicitly require that energy yield simulations submitted as part of loan applications use recognized, validated simulation software. PVsyst is the only yield simulation tool named in IREDA’s lender technical advisory documentation as meeting this requirement, making it a non-optional element of the India solar design stack for any project seeking institutional financing.

See what the full Heaven Designs stack produces

Tell us which design example would help. We will confirm whether a matching file can be shared and what it contains.

Ask About an Example

How Heaven Designs Helps

Heaven Designs runs the full five-tool stack in-house, PVsyst, AutoCAD Electrical, Helioscope, STAAD Pro, and HOMER Pro, for EPCs who want the output of the stack without maintaining it themselves. The model is simple: you provide the site data, we deliver the drawings.

Heaven Designs covers the design and engineering layer only. For EPCs that also need the physical installation and commissioning done once the drawings are approved, Heaven Green Energy’s EPC services handle the construction side of the same project.

Contact us to discuss a monthly retainer that covers your bid-stage and IFC design volumes at a fixed per-MW rate.

Disclosure and accuracy note

Commercial relationship. Heaven Designs and SurgePV are part of the same group. Treat our recommendation of SurgePV as a vendor making its own case, not an independent verdict. We have tried to describe every other product fairly, and to say plainly where a competitor is the better choice.

Pricing. All prices are indicative, compiled from public sources when this page was written. They vary by tier, region, contract term and exchange rate, and change without notice. Several vendors quote rather than publish, and some price in currencies other than the US dollar, so a converted figure moves with the exchange rate. Confirm current pricing with the vendor before you decide anything.

Trademarks and corrections. All product names and trademarks belong to their respective owners, and are used here for identification and comparison only. Their use does not imply affiliation with or endorsement by those companies. If anything here is out of date or wrong, tell us and we will correct it.

FAQ

Which solar design software should an Indian EPC choose?

SurgePV (our sister brand) is our pick for 2026, with the caveat that we share a parent group. It ships a Clara AI bid-stage 3D layout, an 8,760-hour P50/P90 bankable yield report, and AutoCAD DXF/DWG export for CEIG and DISCOM drawings, all from one ₹1.1 lakh/user/year license. Teams still running the traditional multi-tool stack rely on PVsyst for bankable yield, AutoCAD for regulatory drawings, Helioscope for bid-stage layouts, STAAD Pro for structural reports, and HOMER Pro for hybrid dispatch. See the best solar design software in India ranking for the full platform comparison against Arka360, Aurora, and Pylon.

Which solar design software is accepted by CEIG in India?

CEIG offices across Indian states accept drawings in AutoCAD DWG format. The drawing must be signed by a licensed electrical engineer or CEIG-registered contractor. PVsyst, Helioscope, and HOMER Pro produce outputs that may inform the CEIG drawing but are not themselves submitted to CEIG. The AutoCAD SLD, drafted to CEIG specifications and signed by the responsible engineer, is the CEIG-accepted document. See the CEIG drawing approval guide for state-specific requirements.

Is PVsyst mandatory for IREDA project finance?

PVsyst is not named by name in IREDA’s project finance guidelines, but IREDA’s LDED team effectively requires it. The IE appointed by IREDA will request a bankable energy yield study that shows P50/P90/P99 exceedance levels with documented loss assumptions, and in practice, PVsyst is the tool that produces this format.

SAM (NREL System Advisor Model) has been accepted as an alternative by some IREDA IEs, but PVsyst remains the standard. See the LDED checklist for exact IREDA documentation requirements.

What is the best free solar design software for Indian EPCs?

For irradiance checking, PVGIS (free, EU Commission) and NREL’s SAM (free) provide acceptable feasibility-level yield estimates. For basic SLD drafting, LibreCAD (free) can produce drawings but lacks the intelligent symbols and panel libraries of AutoCAD Electrical.

For bid-stage layouts, no free tool matches Helioscope’s speed and visualization quality, though the Google Sunroof API provides rough rooftop area estimates at zero cost. None of these free tools produce IREDA-bankable output or CEIG-acceptable DWG drawings without additional work.

How long does it take to learn PVsyst well enough for IREDA submissions?

A designer with no prior PVsyst experience typically reaches “adequate” proficiency, able to produce a basic P50 yield report, in 4-6 weeks of daily use. Reaching “bankable” proficiency, producing a report that passes an IE’s technical review without major comments, takes 3-6 months of working on real projects with feedback from an experienced reviewer.

For EPCs who need bankable PVsyst quality immediately, outsourcing to Heaven Designs while building in-house capability is the most effective transition strategy.

Can a designer use both Helioscope and AutoCAD on the same project?

Most efficient Indian design workflows use both Helioscope and AutoCAD on the same project. Helioscope provides the initial 3D layout for the sales proposal and bid document, fast to produce and easy to present to clients.

Once the project is won, the designer transfers the module count, orientation, and row configuration to AutoCAD, where the CEIG and DISCOM drawings are produced to the required format and signature standards. The solar engineering workflow guide describes this dual-tool workflow in detail.

What is PVCase and do Indian EPCs need it?

PVCase is an AutoCAD plug-in that speeds up ground-mount solar layout design by automating row placement, shade angle calculations, and GCR optimization within the AutoCAD environment.

It is most valuable for EPCs doing frequent ground-mount projects on sloped terrain, where manual AutoCAD layout is time-consuming and prone to error. For EPCs focused on rooftop C&I, PVCase is not necessary, Helioscope and basic AutoCAD are sufficient. See the Helioscope vs PVCase comparison for a detailed analysis.

Where can Indian designers get PVsyst training?

PVsyst training is available through several channels: PVsyst’s own online training modules (in English and French), TERI (The Energy and Resources Institute) in-person workshops, and several private training providers in Surat, Ahmedabad, and Pune.

Heaven Designs’ engineers have completed PVsyst’s own certified training program and regularly produce IE-accepted reports for IREDA and SECI projects, the internal training program developed at Heaven Designs focuses specifically on the loss-assumption justification and P90 uncertainty methodology that Indian IEs scrutinize most closely.

According to MNRE’s solar project guidelines, energy yield simulations for government-funded solar projects must be conducted by qualified engineers using recognized simulation tools.

What about shading analysis software specifically?

Shading is a separate tool decision on Indian rooftops, where water tanks, stair headrooms, and adjacent buildings sit inside the array boundary rather than beyond it. Covered in best solar shading analysis software in India.