Electrical Design Services
Power, lighting, and distribution design coordinated in BIM: clear panels, circuits, and constructible layout packages.
MEP Design
Electrical design that powers and lights the whole building
We provide electrical design support for building projects: distribution layouts, lighting concepts, panel schedules, and coordinated models that align with mechanical, plumbing, and fire systems.
B2B teams use us as an extended electrical drafting and BIM resource. Property owners get clear plans a contractor can price and install.
Electrical packages are scoped to your stage of work: concept layouts for early pricing, detailed plans for construction, or BIM conversion of existing 2D electrical sets into 3D models for multi-trade coordination.
Because Heaven Designs also works in solar electrical engineering, we bring strong discipline around single-line clarity, equipment schedules, and constructible documentation.
WHO IT'S FOR
Built for how you buy design work
Whether you run a firm or own a building, the package is structured for clear decisions and clean handoff.
Design firms & consultants
Extend capacity for peak workloads with a team that understands MEP coordination and sheet standards.
General Contractors and Subcontractors
Get coordinated models and install-ready drawings that reduce field conflicts and change orders.
Developers & owners
Clear packages for homes, commercial fit-outs, and industrial facilities you can hand to builders.
WHAT WE DELIVER
Scope of work
Detailed capabilities you can scope into a single package or phase across design stages.
Power distribution layouts
Risers, feeders, and branch circuit planning coordinated to architecture.
Lighting layouts
Fixture layouts and zoning support for residential and commercial spaces.
Panel schedules
Clear schedules that support construction and commissioning.
Single-line concepts
SLD-level diagrams where project scope includes electrical one-lines.
Device & outlet plans
Power and data device layouts aligned to furniture and room function.
Electrical BIM model
Electrical BIM content coordinated with other disciplines.
Legend & notes
Symbols, abbreviations, and general notes for field clarity.
Sheet sets
Plan sheets and details formatted to your CAD/BIM standards.
Deep capabilities
What “good” looks like on this service
Beyond a simple drawing set, we focus on coordination, documentation clarity, and packages your next stakeholder can actually use.
Discuss your scope →- Electrical design and BIM modeling for multi-discipline projects
- Coordination with HVAC, plumbing, and fire protection routes
- Support for residential, commercial, healthcare, and industrial buildings
- Greenfield and renovation electrical documentation
- BIM and CAD delivery
- Pairs cleanly with CAD-to-BIM conversion of legacy sets
ENGAGEMENT CLARITY
What you send · What you get
Inputs we need
Share whatever you have, incomplete sets are fine; we will flag gaps early.
- Architectural plans (PDF, DWG, or BIM model)
- Structural model or drawings (when available)
- Design criteria, codes, and client standards
- Equipment preferences or manufacturer cut sheets
- Scope notes: greenfield, retrofit, or fit-out
- Target timeline and preferred sheet format
Outputs you receive
Deliverables are confirmed in the proposal so there are no surprises at handoff.
- Coordinated MEP BIM model (agreed LOD)
- Plan, section, and detail sheets
- Equipment / fixture schedules
- Clash or coordination notes (as scoped)
- QA checklist and revision log
- Handoff package for construction or next design stage
OUTCOMES
Why teams invest in this service
Coordinated ceiling & shaft space
Electrical routes planned with ducts, pipes, and structure in mind.
Clean documentation
Schedules and sheets that reduce ambiguity for installers.
Flexible capacity
Add electrical BIM bandwidth when your in-house team is full.
One partner with solar depth
Electrical discipline experience backed by our solar electrical engineering work.
Better bid packages
Clear plans help contractors price with fewer assumptions.
Faster brownfield updates
Rebuild old electrical PDFs into models you can revise confidently.
USE CASES
Where this service shows up on real projects
Residential & multi-family
Villas, apartments, and hostels, efficient layouts for wet areas, HVAC zones, and service shafts.
Commercial & hospitality
Offices, malls, hotels, restaurants, and lounges with dense ceiling coordination.
Healthcare & education
Clinics, hospitals, and campuses that need careful routing and documentation clarity.
Industrial & aviation
Plants, warehouses, hangars, and process buildings with plant-room intensity.
HOW WE WORK
From kickoff to construction-ready package
A transparent workflow so you always know what happens next.
Collect loads & backgrounds
Architecture, equipment lists, and existing electrical sheets.
Distribution strategy
Panel hierarchy, risers, and routing approach for the building.
Plan development
Lighting, power, and device layouts modeled and drafted.
Coordination
Align with mechanical, plumbing, fire, and structure.
Issue package
Sheets, schedules, model, and revision notes.
QUALITY
QA before every delivery
Packages leave only after internal review. The goal is fewer RFIs, cleaner coordination, and models that do not surprise the site team.
- Model naming, levels, and view discipline checked against project standards
- Critical dimensions validated against source drawings where conversion applies
- System connectivity and connector logic reviewed on MEP families
- Clash priorities reviewed for plant rooms, corridors, and ceiling zones
- Sheet sets checked for missing tags, schedules, and callouts
- Revision cloud / change log maintained through client feedback cycles
Delivery standard
Constructible models · Clear sheets · Documented revisions
WHY HEAVEN DESIGNS
A better partner for electrical design
Constructible, not decorative
We design and model for install conditions, shafts, plant rooms, and ceilings that must work on site.
Multi-discipline awareness
Mechanical, electrical, plumbing, and fire are planned together so trades do not fight for space.
Engineering delivery culture
Heaven Designs already delivers precision packages for 300+ EPCs, same discipline applied to MEP/BIM.
Flexible engagement
One-off packages, ongoing outsourcing, or peak support when your in-house team is full.
TOOLS
Software that powers delivery
BIM Modelling Software
Primary modeling environment for coordinated MEP systems and sheet production.
CAD
2D documentation, legacy CAD support, and hybrid workflows with BIM.
PROJECT TYPES
Greenfield, brownfield, and more
Not sure which package you need?
Send your drawings and we will recommend design-only, BIM conversion, coordination, or a combined package, usually within one business day.
Send project files →INDUSTRIES WE SERVE
Built for every building type
Specialized MEP, BIM, and design support tailored to each sector.
Portfolio proof
Project visuals for Electrical Design
Real coordinated models, the kind of proof buyers look for before awarding work.
Coordinated electrical cable tray and conduit distribution across a floor
Cable tray and conduit routing modelled under the ceiling
Electrical room model with cable trays, conduits, and control panel
Electrical conduit runs coordinated with other building services
HOW TO ENGAGE
Pick the model that fits
Project package
Fixed-scope design or BIM package with clear milestones and deliverable list.
Start this model →Extended team
Ongoing capacity for your firm, we work inside your templates and weekly cadence.
Start this model →Peak / surge support
Short-term help when deadlines stack, conversion, coordination, or sheet production.
Start this model →Ready to scope Electrical Design?
Share drawings or a short brief. We respond with a recommended package, timeline, and commercial options.
Two paths. Same engineering standard.
B2B, Firms & contractors
Extend your design team
Architects, Consultants, Contractors and Developers use Heaven Designs for coordinated models, design packages, and surge capacity without permanent headcount.
- ✓ NDA-friendly workflows
- ✓ Work inside your templates when provided
- ✓ Milestone billing for larger scopes
B2C, Property owners
Clear plans for your building
Homes, villas, restaurants, clinics, and small commercial spaces, get drawings you understand and a contractor can price.
- ✓ Simple kickoff over call or WhatsApp
- ✓ Visual 3D where it helps decisions
- ✓ Packages sized for small projects
FAQ
Frequently asked questions
Do you stamp electrical drawings as a PE?
Can you convert existing electrical CAD into BIM?
What inputs do you need?
Do you design lighting and power together?
Can electrical work be part of a full MEP package?
How do you handle client CAD standards?
Related services
Pair this service with coordination, conversion, or sister disciplines.
Mechanical Design
Code-aware HVAC and hydronic design with coordinated BIM models, from load calcs to construction-ready sheets.
Learn more →Plumbing Design
Domestic water, drainage, and pump-room design modeled in 3D as clear, buildable plumbing packages.
Learn more →Fire Protection Design
Sprinkler systems, fire pump rooms, and risers designed and modeled for coordination and installation.
Learn more →MEP BIM Services
Multi-discipline MEP BIM models: accurate systems, clean coordination and construction-ready sheets.
Learn more →Ready for constructible design packages?
Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.