Clash Detection Services and BIM Coordination
Clash detection services for design firms and contractors: find and fix conflicts between trades in 3D for fewer RFIs, cleaner installs and coordinated models.
BIM Services
Coordination that protects your construction schedule
Clash detection identifies where ducts, pipes, cable trays, structure, and architecture occupy the same space. We run multi-discipline coordination, document issues, and help resolve them in the model.
Using coordinated pump rooms, overall building models, and dense service areas from real projects, we focus on constructability, not just colored clash screenshots.
Good coordination is about priority rules, not infinite clash counts. We focus first on plant rooms, shafts, corridors, and congested ceilings: the places that actually stop construction.
Engage us for report-only reviews or full resolution support where we adjust MEP models until critical paths are clear.
WHO IT'S FOR
Built for how you buy design work
Whether you run a firm or own a building, the package is structured for clear decisions and clean handoff.
Design firms & consultants
Extend capacity for peak workloads with a team that understands MEP coordination and sheet standards.
General Contractors and Subcontractors
Get coordinated models and install-ready drawings that reduce field conflicts and change orders.
Developers & owners
Clear packages for homes, commercial fit-outs, and industrial facilities you can hand to builders.
WHAT WE DELIVER
Scope of work
Detailed capabilities you can scope into a single package or phase across design stages.
Federated model assembly
Combine architecture, structure, and MEP models for review.
Clash tests
Hard and soft clash rulesets aligned to project priorities.
Issue reports
Prioritized clash lists with views and responsibility tags.
Zone focus packs
Deep dives on plant rooms, shafts, and congested ceilings.
Coordination meetings support
Clear visuals for weekly coordination calls.
Resolution updates
Model revisions until critical paths are clear.
Open issues tracker
Living list of unresolved items with owners and due dates.
Sign-off package
Coordinated model snapshot for construction handover.
Deep capabilities
What “good” looks like on this service
Beyond a simple drawing set, we focus on coordination, documentation clarity, and packages your next stakeholder can actually use.
Discuss your scope →- MEP-to-MEP and MEP-to-structure coordination
- Priority on plant rooms, shafts, corridors, and ceilings
- Reporting format tailored to general contractor or design-team workflow
- Pairs with CAD-to-BIM and full MEP design services
- Report-only or full resolution engagement models
- Constructability-first prioritization, not vanity clash counts
ENGAGEMENT CLARITY
What you send · What you get
Inputs we need
Share whatever you have, incomplete sets are fine; we will flag gaps early.
- Architectural plans (PDF, DWG, or BIM model)
- Structural model or drawings (when available)
- Design criteria, codes, and client standards
- Equipment preferences or manufacturer cut sheets
- Scope notes: greenfield, retrofit, or fit-out
- Target timeline and preferred sheet format
Outputs you receive
Deliverables are confirmed in the proposal so there are no surprises at handoff.
- Coordinated MEP BIM model (agreed LOD)
- Plan, section, and detail sheets
- Equipment / fixture schedules
- Clash or coordination notes (as scoped)
- QA checklist and revision log
- Handoff package for construction or next design stage
OUTCOMES
Why teams invest in this service
Cut field rework
Conflicts cost far more on site than in the model.
Faster decisions
Clear clash views help owners, general contractors and subcontractors decide quickly.
Trade fairness
Space is allocated intentionally across disciplines.
Schedule protection
Fewer install stoppages from last-minute clashes.
Cleaner meetings
Agenda-ready issue packs instead of raw software dumps.
Handoff confidence
Coordinated snapshots for construction kickoff.
USE CASES
Where this service shows up on real projects
Residential & multi-family
Villas, apartments, and hostels, efficient layouts for wet areas, HVAC zones, and service shafts.
Commercial & hospitality
Offices, malls, hotels, restaurants, and lounges with dense ceiling coordination.
Healthcare & education
Clinics, hospitals, and campuses that need careful routing and documentation clarity.
Industrial & aviation
Plants, warehouses, hangars, and process buildings with plant-room intensity.
HOW WE WORK
From kickoff to construction-ready package
A transparent workflow so you always know what happens next.
Assemble models
Link architecture, structure, and MEP into a federated set.
Define rules
Hard/soft clash tolerances and priority zones with the client.
Run & filter
Clash tests filtered to meaningful construction issues.
Report & assign
Issue packs for each trade with clear ownership.
Resolve & recheck
Model updates and re-tests until critical paths clear.
QUALITY
QA before every delivery
Packages leave only after internal review. The goal is fewer RFIs, cleaner coordination, and models that do not surprise the site team.
- Model naming, levels, and view discipline checked against project standards
- Critical dimensions validated against source drawings where conversion applies
- System connectivity and connector logic reviewed on MEP families
- Clash priorities reviewed for plant rooms, corridors, and ceiling zones
- Sheet sets checked for missing tags, schedules, and callouts
- Revision cloud / change log maintained through client feedback cycles
Delivery standard
Constructible models · Clear sheets · Documented revisions
WHY HEAVEN DESIGNS
A better partner for clash detection & coordination
Constructible, not decorative
We design and model for install conditions, shafts, plant rooms, and ceilings that must work on site.
Multi-discipline awareness
Mechanical, electrical, plumbing, and fire are planned together so trades do not fight for space.
Engineering delivery culture
Heaven Designs already delivers precision packages for 300+ EPCs, same discipline applied to MEP/BIM.
Flexible engagement
One-off packages, ongoing outsourcing, or peak support when your in-house team is full.
TOOLS
Software that powers delivery
BIM Modelling Software
Primary modeling environment for coordinated MEP systems and sheet production.
CAD
2D documentation, legacy CAD support, and hybrid workflows with BIM.
PROJECT TYPES
Greenfield, brownfield, and more
Not sure which package you need?
Send your drawings and we will recommend design-only, BIM conversion, coordination, or a combined package, usually within one business day.
Send project files →INDUSTRIES WE SERVE
Built for every building type
Specialized MEP, BIM, and design support tailored to each sector.
Portfolio proof
Project visuals for Clash Detection & Coordination
Real coordinated models, the kind of proof buyers look for before awarding work.
Dense multi-service coordination model
Overall building coordination model
Plant room coordination
Fire protection coordinated with structure
HOW TO ENGAGE
Pick the model that fits
Project package
Fixed-scope design or BIM package with clear milestones and deliverable list.
Start this model →Extended team
Ongoing capacity for your firm, we work inside your templates and weekly cadence.
Start this model →Peak / surge support
Short-term help when deadlines stack, conversion, coordination, or sheet production.
Start this model →Ready to scope Clash Detection & Coordination?
Share drawings or a short brief. We respond with a recommended package, timeline, and commercial options.
Two paths. Same engineering standard.
B2B, Firms & contractors
Extend your design team
Architects, Consultants, Contractors and Developers use Heaven Designs for coordinated models, design packages, and surge capacity without permanent headcount.
- ✓ NDA-friendly workflows
- ✓ Work inside your templates when provided
- ✓ Milestone billing for larger scopes
B2C, Property owners
Clear plans for your building
Homes, villas, restaurants, clinics, and small commercial spaces, get drawings you understand and a contractor can price.
- ✓ Simple kickoff over call or WhatsApp
- ✓ Visual 3D where it helps decisions
- ✓ Packages sized for small projects
FAQ
Frequently asked questions
Do you only report clashes or also resolve them?
Which tools do you use?
How often should coordination run?
Can you coordinate only plant rooms first?
What if models are incomplete?
Related services
Pair this service with coordination, conversion, or sister disciplines.
Mechanical Design
Code-aware HVAC and hydronic design with coordinated BIM models, from load calcs to construction-ready sheets.
Learn more →Electrical Design
Power, lighting, and distribution design coordinated in BIM: clear panels, circuits, and constructible layout packages.
Learn more →Plumbing Design
Domestic water, drainage, and pump-room design modeled in 3D as clear, buildable plumbing packages.
Learn more →Fire Protection Design
Sprinkler systems, fire pump rooms, and risers designed and modeled for coordination and installation.
Learn more →Ready for constructible design packages?
Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.