STAAD Pro Report and Calculations for Solar Structures

STAAD Pro report and structural calculations for EPCs and installers who need solar mounting systems checked against wind, dead and seismic loads.

STRUCTURAL ENGINEERING

Precision Structural Analysis for Solar Mounting Systems

A STAAD Pro report shows that a solar mounting structure can carry its design loads. Heaven Designs uses STAAD Pro, a widely used structural analysis package, to check every member against the project's wind, dead and seismic loads and the applicable code.

We model rooftop and ground mount structures, from small MS frames to MW-scale tables on uneven terrain. The aim is a section that is safe without carrying steel it does not need.

Get a quote

300+

EPC Clients Served

50+

Engineers on the Team

102+ MW

Solar Capacity Designed

15+

Countries Delivered To

DELIVERABLES

What's Included in Every Report

Every STAAD Pro report is prepared by our structural engineering team and includes the documentation typically needed for execution and approval submissions.

01

STAAD Pro Analysis Report

Complete structural analysis output including node displacements, member forces, and unity check ratios for all structural members.

02

Wind & Dead Load Calculations

IS 875 Part 3 compliant wind load analysis with basic wind speed inputs specific to project location and terrain category.

03

Seismic Analysis

IS 1893 seismic zone-based analysis ensuring mounting structure performance under earthquake loading conditions.

04

Foundation Design

Pile/footing design calculations for ground mount solar structures, covering bearing capacity and settlement checks.

05

Structural Drawing Set

CAD drawings showing member sizes, connections, base plate details, and anchor bolt specifications.

06

Bill of Materials

Detailed steel quantity take-off with section sizes, grades, lengths, and weights for procurement.

SOFTWARE TOOLS

Engineering Software We Use

We help EPC clients cut structural cost with optimised designs, built in standard engineering software.

🏗️

STAAD Pro

Industry-standard structural analysis and design software for solar mounting structures

📐

CAD

Precision 2D/3D CAD drawings for structural details and general arrangement

🖥️

SketchUp

3D modelling for site layout, panel placement, and structure visualisation

⚙️

SAP2000

Second structural model for cross-checking critical members when a project calls for it

☀️

PVsyst

Energy yield simulation used to check tilt and row-spacing choices against shading losses

HOW IT WORKS

How We Prepare a Solar STAAD Pro Report

A STAAD Pro report is only as good as its inputs. We start from the approved array layout, the structure type (MS or GI, rooftop or ground mount) and the site location, which sets the basic wind speed, terrain category and seismic zone.

  • Inputs: layout, module and structure details, site location, and soil notes when foundations are in scope.
  • Load cases: dead load, wind to IS 875 Part 3 (or ASCE 7 on US projects) and seismic to IS 1893, combined as the code requires.
  • Model and check: members, connections and supports are modelled, unity ratios are reviewed, and sections are optimised.
  • Report and drawings: the analysis report, structural drawings and a steel BOM for procurement.

For the method behind the report, read our STAAD Pro modelling guide for solar structures, the walkthrough on modelling pile foundations in STAAD Pro, and what lenders expect from a STAAD report. Projects that mix Indian and US codes should also see the ASCE 7-22 vs IS 875 wind load comparison.

STAAD reports often ship as part of a wider package: see solar civil and structural engineering, ground mount design and rooftop detailed engineering.

GET STARTED

Get a scope and price for this project

Tell us the site, system size and what drawings you need. We reply within 1 business day.

  • We reply within 1 business day
  • Plan check comments handled with you
  • No obligation, no retainer to start
“Heaven Designs has been an exceptional partner for our EPC projects. Their turnaround time and design accuracy are unmatched. We have completed multiple projects with zero design rework. Highly recommended for any solar EPC company looking for reliable design support.”
Mr. Rahul Mehta , Enerture Solar
Case study: 11 MW DC tin-shed rooftop, Gulf country →

We reply within 1 business day, Mon to Sun, 8 AM to 6 PM IST. By submitting you agree to our Privacy Policy.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.