Mechanical Design
Code-aware HVAC and hydronic design with coordinated BIM models, from load calcs to construction-ready sheets.
Read More →Coordinated mechanical, electrical, plumbing, and fire protection design, with BIM delivery for firms and property owners.
MEP VERTICAL
Heaven Designs delivers MEP design packages and coordinated 3D models for residential, commercial, healthcare, industrial, and aviation facilities. We take on CAD-to-BIM conversion or full discipline design, on greenfield or brownfield sites.
Built for B2B teams that need extended design capacity, and for owners who need clear drawings a contractor can build from. US contractors can read how MEP design outsourcing works, and data centre teams our guide to outsourcing data centre MEP design.
MEP DESIGN
Code-aware HVAC and hydronic design with coordinated BIM models, from load calcs to construction-ready sheets.
Read More →
Power, lighting, and distribution design coordinated in BIM: clear panels, circuits, and constructible layout packages.
Read More →
Domestic water, drainage, and pump-room design modeled in 3D as clear, buildable plumbing packages.
Read More →
Sprinkler systems, fire pump rooms, and risers designed and modeled for coordination and installation.
Read More →ALSO OFFERED
Multi-discipline MEP BIM models: accurate systems, clean coordination and construction-ready sheets.
Turn 2D drawings into usable BIM models: the first step toward coordination and modern delivery.
Clash detection services for design firms and contractors: find and fix conflicts between trades in 3D for fewer RFIs, cleaner installs and coordinated models.
Custom BIM families for equipment and components: accurate, parametric, and project-ready.
How we work
PDF, CAD, BIM models, or site photos, we scope M/E/P/F or CAD-to-BIM conversion.
MEP BIM modeling, load sizing where required, and system layouts per your standards.
Clash detection across disciplines and revisions until the model is buildable.
Sheets, schedules, models, and QA-checked packages ready for construction or permit.
, Industries we serve
Hands-on experience across residential, commercial, healthcare, industrial, aviation, and more, greenfield and brownfield.
FAQ
Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.