QuickEstimate website, opens in a new tab A Solar CRM Built for Growing Solar Businesses
We design and engineer solar projects. Before any of that work starts, someone has to capture the lead, survey the roof, price the system, send the proposal and chase the customer until they sign. QuickEstimate is the solar CRM we recommend for that half of the job — leads, pipeline, quotations, proposals and follow-ups in one place.
QuickEstimate is a product of Heaven Softech Pvt. Ltd., Surat, and is branded on its own site as Quickest Solar CRM. It is a separate company from Heaven Designs. We recommend it as our CRM partner; we do not resell it.
Leads arrive from
- Meta lead ads
- Marketplaces
- Website form
- Walk-in
- Phone
- Spreadsheet
Solar sales pipeline
- New Lead
- Site Survey
- Proposal Sent
- Negotiation
- Subsidy Filed
- Installation
- Commissioned
Design, engineering & permits
Where Heaven Designs picks the project up
The problem
Solar Sales Are Too Complex for Spreadsheets
We work with solar EPCs and project teams every week. The engineering is rarely what holds a growing solar business back. What holds it back is everything that happens before a project reaches an engineer.
A rooftop customer takes weeks to decide and compares three quotes while they do it. The enquiries arrive from six places at once. Somewhere between the ad spend and the signed order, deals go quiet and nobody notices, because nothing in the business is watching.
Explore QuickEstimate , opens in a new tab-
Leads arrive in six different places
Meta lead ads, marketplace enquiries, the website form, a WhatsApp message, a walk-in and a rep's phone. Nothing counts them, so nobody knows how many were never called.
-
The follow-up is the deal
Rooftop customers compare three quotes and take weeks to decide. A quote sent and never chased is indistinguishable from a quote that was never sent.
-
Every quotation is rebuilt from scratch
A fresh spreadsheet per enquiry, rates keyed in by hand, subsidy looked up again. Two reps quoting the same system arrive at two different numbers.
-
The pipeline lives in the owner's head
Ask which deals close this month and the answer is a guess. There is no stage, no age and no owner attached to anything.
-
Field work never reaches the record
A survey happens on a roof, the notes stay in a rep's phone, and the office finds out when the customer asks why nothing moved.
-
Nobody knows which spend works
Ad budget goes out monthly with no cost-per-lead or cost-per-acquisition by source, so the worst-performing channel keeps its budget.
The workflow
Great Solar Projects Need Great Sales Operations
Every solar project runs the same commercial sequence before a single drawing is produced. QuickEstimate is where the first seven steps are managed. The eighth is ours.
-
Lead
An enquiry lands from an ad, a marketplace, the website, a call or a walk-in, and is filed against one record instead of a notebook.
-
Qualification
Roof, load, budget and intent get established, the lead is tagged hot, warm or cold, and it is assigned to the rep who will own it.
-
Site survey
Someone visits the roof. Notes, photos and the location attach to the lead from the phone that took them.
-
Quotation
Capacity, panel, inverter and mounting resolve to an itemised BOM with GST and the subsidy line, priced off a catalogue rather than memory.
-
Proposal
The customer receives a branded PDF carrying your logo, GST number and terms, sent on WhatsApp or email with opens tracked.
-
Follow-up
Reminders fire on a schedule instead of on memory, and stop the moment the customer replies.
-
Customer
The deal is won. The record keeps every quote, message and note behind it, so whoever handles the account next is not starting cold.
-
Engineering & installation
Now the project needs drawings, structural calculations and a permit set. This is where Heaven Designs picks it up.
Our engineering services
QuickEstimate manages the commercial record at each of these stages. It does not perform the site survey, the installation or the engineering, and nothing here claims otherwise.
Inside the product
Everything Your Solar Sales Team Needs
Five things a solar business has to get right between an enquiry and a signed order, and what QuickEstimate publishes about each.
Lead management
Capture Every Solar Lead
Enquiries stop arriving in six inboxes and start arriving in one list. QuickEstimate imports from advertising and marketplace sources, web forms and spreadsheets, and takes leads entered by hand on site.
Each one is assigned to a named rep by round-robin, territory or source, and that rep is notified on WhatsApp and in the app. Duplicates are flagged when the same customer arrives twice from two different channels.
Lead capture on QuickEstimate , opens in a new tabSources
- Meta lead ads
- Marketplace enquiries
- Website form
- Google Forms
- Walk-in
- Phone call
- Spreadsheet import
One lead list, one owner each
- Round-robin
- By territory
- By source
Assigned rep notified on WhatsApp and in-app · duplicates flagged · hot, warm and cold tagging
Sales pipeline
See Your Sales Pipeline
The stages are the solar sales process, not generic sales vocabulary. A deal at Subsidy Filed means something specific, and it means the same thing to everyone in the business.
Deals that sit in one stage past a set period raise an alert, so a lead going quiet is a notification rather than a discovery three weeks later. Forecasting weights the pipeline by stage probability, and conversion is broken out per rep. Stages are editable if your process runs differently.
Pipeline management on QuickEstimate , opens in a new tabDefault stages
- New Lead
- Site Survey
- Proposal Sent
- Negotiation
- Subsidy Filed
- Installation
- Commissioned
A deal idling in one stage past your threshold raises an alert.
Quotations & proposals
Quote Once, Not Twice
A quotation is built from your own catalogue rather than a blank spreadsheet: an itemised BOM across panels, inverter, mounting, cables and accessories, with quantities and rates the business set, plus cost lines for labour, transport, scaffolding and civil work.
GST applies automatically at 5% on solar goods, and the PM Surya Ghar subsidy resolves by capacity bracket and state from a library QuickEstimate states is refreshed weekly. The proposal that reaches the customer carries your logo, company details and GST number — not the software's.
What the quotation is made of
- Panels qty × your rate
- Inverter qty × your rate
- Mounting structure qty × your rate
- Cables qty × your rate
- Accessories qty × your rate
- Labour, transport, civil qty × your rate
- GST on solar goods 5%
- PM Surya Ghar subsidy by bracket & state
Output: a branded PDF carrying your logo, company details and GST number, sent on WhatsApp or email with opens tracked.
Follow-up
Follow Up Without Remembering To
Indian rooftop customers answer WhatsApp. QuickEstimate schedules follow-ups there, from your team's own number, using templates covering the sales scenarios that repeat. Sequences can fire on lead status, on time since last contact, or on whether the proposal was opened.
They pause automatically the moment the customer replies, and stop entirely if someone opts out. The whole conversation stays on the lead's timeline, which is what ends the weekly question of whether anyone actually followed up.
WhatsApp follow-up on QuickEstimate , opens in a new tabA reminder schedule
- Day 1 — automated reminder
- Day 3 — automated reminder
- Day 7 — automated reminder
- Day 14 — automated reminder
Customer replies — the sequence pauses.
Customer opts out — messaging stops.
Team & reporting
Keep Your Team Organised
Lead routing rules, response-time SLAs and role-based access mean a growing sales team does not need the owner sitting in every conversation. Reps update deals and log survey notes and photos from a phone, and the record is the same one the office is looking at.
The reporting answers the questions that decide next month's budget: which source converts, what it costs to acquire a customer through each channel, which rep closes, and how long a deal takes from first enquiry to won.
Sales reports on QuickEstimate , opens in a new tabWhat gets reported
- Revenue trend
- Conversion funnel
- Rep leaderboard
- Source ROI
- Deal velocity
- Average deal size
Exported to PDF or Excel, or emailed to the people who need it on a weekly schedule.
What sits underneath all of it
Built for the phone, works without signal
iOS and Android apps alongside the web app. Leads are captured on a rooftop with no connection and sync when the device is back online.
Teams, roles and routing
Lead routing rules, rep performance, response-time SLAs and role-based access, so a growing sales team does not need the owner in every conversation.
Subsidy and tariff maintained for you
A PM Surya Ghar and state DISCOM tariff library that QuickEstimate states is refreshed weekly, so quotations are not built on last quarter's numbers.
Dealer and channel networks
Territory assignment, dealer performance tracking and lead sharing, for businesses selling through a partner network rather than only a direct team.
Connects to what you already run
Integrations named on the QuickEstimate site include Meta, Google, Pabbly, Razorpay, Tally and Zoho, alongside WhatsApp Business and an open API.
Data kept in India
QuickEstimate publishes hosting on AWS Mumbai, TLS 1.2+ in transit and AES-256 at rest, 30 days of encrypted backups, role-based access and alignment with the DPDP Act 2023.
Who it is for
Built for the Solar Businesses We Work With
The same teams that send us design and engineering work also have a sales operation to run. This is what a CRM changes for each of them.
Solar EPCs
Track every project opportunity from first enquiry to signed order, with a pipeline that shows which of this month's deals are real and which are hope.
Rooftop installers
Keep residential and small commercial leads, quotes and follow-ups in one place instead of across a phone, a notebook and three spreadsheets.
Solar developers
Hold visibility across a portfolio of opportunities and the sales activity behind them, rather than reconstructing status in a weekly call.
Solar sales teams
Give every rep their own assigned leads, their own follow-up schedule and a quotation they cannot get wrong, and give the manager the numbers.
Solar distributors and dealer networks
Assign territories, share leads with channel partners and track how each dealer is performing against the ones next to them.
Growing solar businesses
The point where the owner can no longer personally remember every deal is the point a spreadsheet stops working. This is what replaces it.
Software and services
From Solar Lead to Solar Project
Two separate companies covering two consecutive halves of the same project. QuickEstimate manages the sales and customer workflow. Heaven Designs produces the technical package once the customer has said yes.
QuickEstimate website, opens in a new tab The sales & customer workflow
Everything between an enquiry arriving and a customer signing, plus the record of that customer afterwards. Your own team works in it every day.
- Lead capture , on the QuickEstimate website, opens in a new tab
- Sales pipeline , on the QuickEstimate website, opens in a new tab
- Quotations , on the QuickEstimate website, opens in a new tab
- Proposals , on the QuickEstimate website, opens in a new tab
- WhatsApp follow-up , on the QuickEstimate website, opens in a new tab
- Sales reports , on the QuickEstimate website, opens in a new tab
- Pricing, published on quickestimate.co , opens in a new tab
The technical & engineering workflow
You send the project, our engineers produce the package. The right route when the work needs constructible output, structural calculations, or a permit set that a reviewer will sign off.
- Solar 3D pre-design
- Solar post-design
- Rooftop detailed engineering design
- Solar ground mount design
- Solar permit design
- Civil and structural engineering
- Site survey and land feasibility
- Electrical and CEIG drawings
- MW-scale project management
To be precise about the relationship
QuickEstimate and Heaven Designs support complementary stages of the solar project lifecycle. There is no product integration between them: nothing syncs, nothing transfers automatically, and a project in your QuickEstimate account does not reach our engineers on its own. Use QuickEstimate to manage the sales process, and talk to us when a project needs professional design and engineering support. Our disclosure page explains how we recommend partner products.
Why we recommend it
A Better Workflow for Solar Businesses
Heaven Designs works with solar EPCs, installers and project teams that need reliable technical design and engineering support. We see their projects, and we see the operation behind them.
A successful solar project needs two things to go right. The engineering has to be correct, or the project does not get built. The sales process has to be organised, or the project never exists in the first place. We are good at the first. QuickEstimate covers the second, and it does it with the vocabulary of solar rather than a generic CRM bent into shape.
That is the whole basis of the recommendation. It is not a claim that this is the only solar CRM worth running, and it is not a comparison we have run against every alternative. It is the one we use and the one we point solar teams at when they ask.
Every enquiry submitted through this website — including the form further down this page — is filed into QuickEstimate. We did the integration work for our own business before we wrote a word of this page, which is a different thing from recommending software we have only been shown.
Figures QuickEstimate publishes about itself
- Solar businesses using it
- 1,000+ Solar businesses using it
- Indian states covered
- 22 Indian states covered
- Proposals sent
- 85,000+ Proposals sent
- Pipeline tracked
- 120 MW Pipeline tracked
Figures as published by QuickEstimate on quickestimate.co, opens in a new tab. Heaven Designs has not independently verified them.
Meet our solar CRM partner
QuickEstimate website, opens in a new tab QuickEstimate — solar CRM for solar businesses
QuickEstimate provides solar-focused CRM tools for managing leads, sales pipelines, customers, quotations, proposals and follow-ups. Look around the product site, or read what they publish about the company behind it.
FAQ
Solar CRM, frequently asked questions
What is a solar CRM?
Why do solar companies need a CRM rather than a spreadsheet?
What is QuickEstimate?
What can QuickEstimate actually help with?
Is QuickEstimate integrated with Heaven Designs?
Do I have to choose between QuickEstimate and Heaven Designs?
Can Heaven Designs help with the solar design and engineering side?
How much does QuickEstimate cost?
Next step
Ready to Organise Your Solar Sales?
Two different problems, two different places to start. Look at QuickEstimate if the sales side is what keeps slipping. Talk to us if the projects you have already won need drawings, calculations or a permit set.
Looking for a solar CRM?
QuickEstimate website, opens in a new tab See how a solar-specific CRM handles your leads, customers, quotations and follow-ups. Pricing, plans and a free tier are published on their own site.
Explore QuickEstimate , opens in a new tabNeed solar design & engineering?
3D design, rooftop and ground mount engineering, permit sets, structural calculations, site surveys, CEIG drawings and MW-scale project management, delivered by our own engineers.
Explore our solar servicesNeed help with your solar project?
Tell us what you need. Our team replies within 1 business day.