Objectives
The client’s primary objectives for the 11 MW DC rooftop solar project were:


Accurate and Compliant Design
To develop a design that met the strict criteria set by the local government, ensuring full compliance with all regulations for the tin shed rooftop installation.


Timely Completion
To complete the project within the deadline, avoiding any financial penalties.


Reliable Consultancy and Support
To secure a dedicated team capable of responding to government queries, making necessary revisions, and providing continuous support throughout the project.
Our Approach
Heaven Designs stepped in to provide comprehensive solar design, engineering, and consultancy services tailored to the project’s unique requirements.

Onsite Consultancy and Design Services
- Onsite Presence : Our experts were onsite in the Gulf country for 3 months to oversee the project’s design and ensure adherence to local guidelines, specifically focusing on the challenges of a large-scale installation on a tin shed.
- Full-Zone Design : Over 5 months, we delivered detailed solar design services for the entire 11 MW DC project, ensuring that each section of the rooftop met the rigorous requirements.

Government Compliance:
- Accurate Documentation : Our team managed all government queries, providing prompt and accurate responses that facilitated smooth project progression.
- Responsive Communication : Our team managed all government queries, providing prompt and accurate responses that facilitated smooth project progression.
- As-Built Drawings : Upon completion, we delivered as-built drawings that accurately reflected the final implementation, including all necessary revisions.

Flexibility and Commitment
- Multiple Revisions : We made multiple revisions based on client feedback and evolving requirements, ensuring every aspect of the design was up to standard.
- Work Around the Clock : Our team worked during nights and weekends to meet deadlines, demonstrating our commitment to the client’s success.
Conclusion and Future Plans
This case study demonstrates Heaven Designs’ capability to deliver critical solar design and consultancy services under challenging conditions, particularly for large-scale projects like this 11 MW DC rooftop installation. By addressing the client’s needs with precision and dedication, we not only saved them from significant financial loss but also secured a long-term relationship that continues to thrive.