Solar Engineering P2 Reference 4 min read Reviewed July 8, 2026 Nimesh Katariya Nimesh Katariya

Albedo

Albedo is the share of sunlight reflected by the ground under a PV array. Learn typical values by surface and how albedo drives bifacial gain and yield.

Quick answer

Albedo is the fraction of sunlight a surface reflects, expressed from 0 (absorbs everything) to 1 (reflects everything). PVsyst uses 0.20 as its default ground albedo, while fresh snow can exceed 0.8. Designers use measured or modelled albedo to estimate rear-side irradiance and bifacial gain in energy yield studies.

Albedo Values by Surface

SurfaceAlbedo
Snow (fresh)0.70-0.85
Snow (old)0.40-0.60
White gravel0.25-0.35
Sand (light)0.30-0.40
Concrete (new)0.30
Concrete (aged)0.20
Tan TPO roof0.25-0.35
Wet vegetation0.20
Dry vegetation0.25
Black EPDM0.05
Dark asphalt0.05-0.10
Water0.05-0.10

Design Decisions

For bifacial ground-mount projects, the choice of ground surface materially affects yield:

  • White gravel: +5-8% bifacial gain vs. vegetation.
  • Concrete pad: similar to gravel.
  • Painted white surface: similar to gravel.
  • Sand: +3-5% over vegetation in hot climates.

Surface treatment cost ($0.10-0.50/W) often pays back via 3-5% additional bifacial gain.

Key Takeaways

  • Albedo is the ground reflectance, from 0.05 (asphalt) to 0.85 (snow).
  • Critical input for bifacial gain calculation.
  • Use monthly profile in PVsyst for accurate modeling.
  • High-albedo surfaces (gravel, concrete, sand) boost bifacial gain 5-10%.
  • Site-specific measurement preferred for bifacial bankable projects.

Albedo rarely gets analyzed on its own, it feeds directly into the bifacial gain and rear-side irradiance figures that show up in a project’s yield model. If you’re building that model, the PVsyst tracker yield study methodology walks through where the monthly albedo profile actually enters the simulation chain, and the broader question of which platform to run it in is covered in solar simulation software picks for 2026.

Because a wrong albedo assumption quietly understates or overstates bifacial gain, it also shows up as a swing factor in P50/P90/P99 yield report uncertainty, lenders scrutinize the ground-surface assumption for exactly this reason. On the design side, ground albedo works alongside GCR and DHI as one of the core irradiance-and-layout inputs our Solar 3D Pre-Design team validates before a bifacial ground-mount layout is locked.

Frequently Asked Questions

3 commonly searched questions about Albedo.

What are typical albedo values for solar sites?
Approximate values are 0.05 to 0.10 for dark asphalt, 0.15 to 0.25 for grass, 0.20 to 0.30 for concrete, 0.25 to 0.40 for dry sand and 0.70 to 0.85 for fresh snow. Site measurements beat textbook values for bankable bifacial studies.
How is albedo measured on a solar site?
An albedometer, which pairs an upward-facing and a downward-facing pyranometer, records incoming and reflected irradiance. Dividing reflected by incoming gives albedo. Measuring over several months captures seasonal changes from vegetation, rain and snow, which a single reading misses.
Why does albedo matter for bifacial modules?
Bifacial modules collect light on their rear side, and most of that light is reflected from the ground. A brighter surface sends more light to the back of the module, so higher albedo directly raises bifacial gain, especially on trackers and high-clearance ground mounts.

Need engineering-backed solar designs?

Heaven Designs prepares solar drawings, structural calculations, electrical engineering documents, and project-specific permit plan sets.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.

Get a quote WhatsApp