RatedPower is a Madrid-based software company whose cloud platform, pvDesign, automates the design of utility-scale ground-mount solar plants. It generates layouts, tracker or fixed-tilt arrangements, cabling, roads, single line diagrams, bill of materials and preliminary yield. Developers and EPCs use it for fast feasibility and comparing layout options before detailed engineering.
Key Takeaways
- RatedPower = utility-scale automated solar design.
- Spanish-origin; global use.
- Layout, BOM, basic yield in one tool.
- Cross-check yield in PVsyst.
- Competes with PVcase in same space.
What RatedPower Automates
RatedPower’s core value is speed at the feasibility and early-design stage of a utility-scale ground-mount project. Instead of a designer manually laying out tracker rows, trenching, and access roads for a multi-hundred-acre site, RatedPower takes site boundaries, module and tracker inputs, and terrain data, then generates a layout, a bill of materials, and a preliminary yield number in a fraction of the time a manual pass would take.
That makes it most useful for the “how many megawatts can we fit here, and roughly what will it produce” stage of a project, before the design moves into detailed engineering.
RatedPower in the Design Workflow
Because RatedPower’s yield module is a convenience feature rather than a bankable simulation engine, the typical workflow pairs it with other tools rather than replacing them: RatedPower for rapid layout iteration and BOM takeoff, then a dedicated simulation tool for the finance-grade energy yield assessment once a layout is locked in.
Teams evaluating RatedPower are usually also weighing PVcase, the other well-known automated ground-mount platform, and treating PVsyst as the downstream step for any yield number that needs to hold up to lender scrutiny.
Related Reading
RatedPower sits in the same utility-scale, ground-mount corner of the solar software stack covered in SurgePV’s utility-scale solar design overview, which lays out how tracker plant layout, BOM, and yield modeling typically divide across tools on a real project. For teams comparing RatedPower’s yield output against a bankable simulation, Advanced PVsyst Analysis: How Accurate Yield Predictions Save Millions walks through why that cross-check step matters for financing.
If you’re still deciding which platform belongs in your utility-scale stack at all, Best Solar Design Software in 2027: 10 Platforms Ranked places RatedPower alongside its closest competitors. For plants where the ground-mount EPC work itself is being scoped, Heaven Green Energy’s ground-mount solar park EPC services cover the construction side that follows the design phase RatedPower speeds up.
For a hands-on assessment, see the RatedPower review; the Solar Ladder review covers a lower-cost option for smaller projects.
Disclosure: Heaven Green Energy and SurgePV are Heaven Designs group companies.
Frequently Asked Questions
3 commonly searched questions about RatedPower.
Is RatedPower the same as PVsyst?
How does RatedPower compare with PVcase?
Can RatedPower be used for rooftop solar?