Solar Software P3 Reference 3 min read Reviewed July 8, 2026 Nirav Dhanani Nirav Dhanani

SolarPlus

SolarPlus is a solar proposal and design platform used by some residential installers. Learn what it does, its limits and where engineering review fits.

Quick answer

SolarPlus is a cloud-based solar design and proposal software used by residential installers to lay out rooftop arrays, estimate production, and generate customer quotes. Like similar tools, its outputs are a sales starting point; a permit set for a US jurisdiction still needs engineering review against NEC 2023 Article 690 and local code.

Key Takeaways

  • SolarPlus = residential solar proposal/design platform.
  • Competes with Aurora and OpenSolar.
  • Smaller-installer focus.
  • Subscription pricing.

Where SolarPlus Fits

SolarPlus occupies the same general category as Aurora Solar and OpenSolar: a cloud-based tool that takes a residential rooftop from a rough layout through a customer-facing proposal.

The main difference between these platforms tends to be scale and pricing rather than core functionality, Aurora leans toward larger installers who need deep CRM and financing integrations, OpenSolar leans toward cost-sensitive markets with a free, commission-funded model, and SolarPlus positions itself toward smaller residential shops that want a simpler, subscription-based alternative to either.

For an installer evaluating design software, the practical question is usually the same regardless of which of these three platforms you’re comparing: is the tool being used to close a residential sale, or to produce the engineering documents a jurisdiction will actually stamp and approve?

Sales-and-proposal platforms like SolarPlus are built for the former. Once a deal is signed, most installers still route the project through a dedicated permit design or detailed engineering design process to get an AHJ-ready single-line diagram and structural package.

If you’re weighing SolarPlus against the two platforms it’s most often compared to, our Aurora vs OpenSolar breakdown covers the paid-vs-free trade-off between the two closest analogues, and the Aurora Solar pricing guide is a useful reference point for what a premium residential platform typically costs.

For a broader view of where a lighter tool like SolarPlus sits in the wider field, see our best solar design software in 2026 roundup or, for installers outgrowing a residential-only tool, Aurora Solar alternatives for US installers. SurgePV’s comparison of the top 10 solar design platforms covers similar ground on choosing between residential sales tools and full engineering workflows.

For a sense of the wider tool market, see the online solar design tool guide and the SurgePV design software page.

Disclosure: SurgePV is a Heaven Designs group company.

Frequently Asked Questions

3 commonly searched questions about SolarPlus.

What is SolarPlus software used for?
Installers use it to draw roof arrays over imagery, place modules, estimate annual energy, and produce a branded proposal for the homeowner. The goal is to move quickly from a lead to a signed contract, before the detailed engineering and permit drawings are prepared.
Can a SolarPlus design be submitted for a permit?
A proposal layout usually is not enough on its own. Permit packages need a site plan, single-line diagram, structural attachment details, equipment data sheets, and code calculations prepared to the local authority's requirements. Many installers send the proposal design to an engineering team to build that package.
How does SolarPlus compare with Aurora or OpenSolar?
All three are cloud tools for residential layout, production estimates, and proposals. They differ in shading modelling methods, pricing models, financing integrations, and regional equipment libraries. Installers usually choose based on workflow fit and market coverage rather than any single technical feature.

Need engineering-backed solar designs?

Heaven Designs prepares solar drawings, structural calculations, electrical engineering documents, and project-specific permit plan sets.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.

Get a quote WhatsApp