A solar plan-set sample is useful only when you can tell what it was prepared for, where it was submitted, and how its sheets agree with one another. A polished cover page does not prove that a designer can produce a correct package for your authority having jurisdiction (AHJ). Review a sample as evidence of document control, engineering coordination, and communication quality. Then test the vendor with your actual site and authority requirements before buying a full package.
This guide is for a US installer or EPC evaluating a prospective design vendor. It gives a repeatable sample review, rather than the broad design-quality indicators in our solar design quality guide. Use the checklist below with any legitimately shared vendor sample. A sample should disclose its project context or be clearly labelled as illustrative. The US Department of Energy states that local permit rules vary; do not turn a sample from one city into proof of approval in another.
First ask what the sample represents
Before opening the drawings, request a short context note: system type, size, jurisdiction, permit or construction issue, approximate project date, applicable code or authority edition, whether the package was submitted, and whether comments were received. Ask which sheets or details have been removed for confidentiality. A redacted sample is acceptable if it preserves enough technical relationships to review. It may be inappropriate for a vendor to share client property without permission.
If the vendor cannot disclose the jurisdiction, ask for a sample designed around a clearly identified hypothetical authority checklist instead. Label it as illustrative. Do not accept a fictional “approved” stamp or a fabricated client project as evidence. Conversely, a real but old sample can still show drawing discipline if its date and limitations are clear. The age matters because adopted codes and utility requirements change.
| Sample label | What it can show | What it cannot prove by itself |
|---|---|---|
| Issued permit set | Organisation and content at a particular submission. | That it was approved or that the same content fits your AHJ. |
| Approved permit set | How one AHJ accepted one project at a date. | That the vendor can meet another jurisdiction’s rules. |
| IFC set | Construction coordination and details. | That the permit filing was accepted. |
| Redacted set | Legibility and relationships retained after removal. | Hidden calculations, notes, or approval history. |
| Illustrative sample | Drafting and explanation quality under stated assumptions. | Prior project delivery or actual authority approval. |
This distinction prevents a common procurement error: giving the highest score to the thickest PDF without checking what its title block and transmittal actually say.
Check 1: Match the sample to your project type
A residential rooftop set is weak evidence for a complex commercial roof with multiple switchboards, storage, or structural interfaces. A C&I set may show useful coordination but may not predict the vendor’s ability to handle a small jurisdiction’s simplified process. Ask for the closest available example by mounting type, electrical connection, building complexity, and authority context. Relevance matters more than visual polish.
If the vendor has no close example, ask how it would adapt a package. The answer should name the authority’s checklist, the site survey, structural inputs, equipment datasheets, and review responsibilities. A candid gap with a credible plan is more useful than a claim that all US AHJs use the same sheet list. The DOE permitting page explicitly says local details and fees vary.
Check 2: Read the drawing index and title blocks
Open the index first. Can you identify each sheet, discipline, revision, issue purpose, and date? Does the drawing set have one consistent project name and address? Do the cover, site plan, electrical pages, and details point to the same module and inverter models? A sample can be redacted, but its revision system should remain understandable.
Look for mismatched dates, overlapping “final” versions, broken detail callouts, missing legend symbols, or notes copied from another site. A well-controlled set need not be long. It should be possible to tell what was issued and what each sheet contributes. Ask for a sample response to an AHJ comment if that is part of the vendor’s proposed service. It can show whether comments were actually traced to drawing revisions.
Check 3: Test the site and array plan
The plan should orient the roof or site, locate arrays and major equipment, show the point of interconnection or relevant service location, and make access and physical constraints legible. Check that module count on the plan agrees with the cover and electrical schedule. See whether setbacks and pathways are dimensioned or merely described in a generic note. The exact required setback belongs to the adopted local code and AHJ, not to this checklist.
For rooftop work, look for roof edges, obstructions, equipment, drainage or access features relevant to the design, and a stated basis for roof dimensions. For ground-mounted work, look for boundaries, access roads, equipment pads, and the utility route as applicable. Do not infer that the plan is correct merely because it contains a satellite image. A properly dimensioned drawing must come from a credible survey or documented measurement basis.
Check 4: Trace one electrical path end to end
Choose one string or array and follow it from module to inverter, disconnects, overcurrent devices, service equipment, and point of interconnection. The single-line diagram should make the topology and component ratings legible. Check whether the module count, string count, inverter assignment, and AC output agree across the plan, SLD, schedules, and equipment data. If a device is labelled on the drawing but absent from the schedule, ask why.
A sample need not disclose every calculation if the owner restricted it, but ask how the designer checks conductor sizing, voltage, protection, grounding/bonding, and equipment ratings for the actual project. The California Solar Permitting Guidebook includes an example electrical-plan checklist with module/string counts, inverter model, one-line diagram, conductors, raceways, and grounding. That is a historical guidebook example, not current statewide authority for your project. Use your AHJ’s present instructions for acceptance.
Check 5: Examine structural assumptions and mounting details
Look for a clear statement of the structural design basis, mounting system, roof or foundation information, attachment method, and responsibility for calculations or review. A generic “existing roof adequate” note without identified evidence is a question to raise. The required professional role changes by jurisdiction and project. For example, New York City’s current solar owner guidance states that a Registered Design Professional prepares and submits construction documents including structural analysis for that city. That requirement is a NYC example, not a blanket US rule.
Ask whether the vendor’s service includes the structural review itself, coordinates with an owner-provided engineer, or only drafts details based on supplied calculations. Look for consistency between module count, mounting layout, attachment detail, and equipment weight. If the sample is a small residential job but your project is a commercial roof, ask for a more relevant structural workflow rather than assuming the detail can be reused.
Check 6: Verify local approval context
Find the named AHJ, utility, and issue purpose. If the sample claims approval, request the authority’s acceptance evidence where sharing is permitted. If it claims a stamped package, confirm who stamped it, the jurisdiction, discipline, and date. Do not rely on a blurry seal or a sales email that says “permit ready.” The vendor’s proposed service should specify whether it provides drawings, coordinates a licensed professional, submits the application, or responds to comments.
New York City, for example, distinguishes building and electrical permits and identifies licensed roles in its registrant guidance. A vendor who has prepared a sample for a different city should explain the adaptation path. It should not promise that a prior set will pass your AHJ unchanged. The local authority’s current application instructions and utility requirements are the controlling references.
Check 7: Look for coordination, not just individual sheet quality
The most revealing test is a cross-sheet audit. Pick five values: module model, module count, inverter model, inverter count, and point of interconnection. Find each wherever it appears. Add roof access or structural load if those are central to your project. A mismatch does not automatically disqualify a vendor; it does require an explanation of which revision is correct and how QA found or missed the discrepancy.
A helpful review note is specific: “Cover lists 220 modules; array plan appears to show 216; please show how the count is reconciled.” That question tests whether the team can trace a value through its own documentation. Avoid vague criticism such as “the drawing seems incomplete.” A sample is only a small evidence slice, so assess the response as well as the initial PDF.
Check 8: Test readability at the size it will be used
Read the PDF on a laptop and at the intended print size. Are text, line weights, symbols, dimensions, and revision notes legible? Is the SLD readable without zooming so far that context disappears? Are repeated notes relevant to the site? Can a field installer find equipment and disconnect locations from the plan? A beautiful rendering is not a replacement for a readable permit or construction drawing.
Check accessibility of the digital package too: descriptive file name, logical sheet order, searchable text where practical, and bookmarks for a long set. These are usability improvements, not universal AHJ requirements. They matter because the installer, reviewer, and owner may all use the same PDF in different settings.
A sample-review scorecard without fake precision
Use a three-level judgment for each area: clear, needs explanation, or cannot assess from this sample. Do not manufacture a numerical vendor score from one redacted PDF. A “cannot assess” mark can be closed with another example, a process demonstration, or a project-specific trial deliverable. Record the reason for every mark and the evidence requested next.
| Area | Clear means | Follow-up when unclear |
|---|---|---|
| Context | Jurisdiction, date, issue purpose, project type known. | Request transmittal or context note. |
| Document control | Index, revisions, title blocks agree. | Ask for current issue register. |
| Site and array | Count and location are traceable. | Ask for survey basis and count reconciliation. |
| Electrical | One path and ratings can be followed. | Request calculation basis or design review explanation. |
| Structural | Attachment and review responsibility identified. | Ask for structural scope and evidence. |
| Approval | Authority route and role are explicit. | Request accepted comment example or local workflow. |
| Usability | Drawing works at intended size. | Request corrected sample or revised sheet. |
The scorecard helps procurement compare evidence, not establish code compliance. A licensed and jurisdiction-specific review is still needed for the actual job.
Questions to send with a sample request
Ask for an example similar to your project, its issue purpose, jurisdiction and date, whether it was submitted or accepted, the drawing index, and the vendor’s role. Request permission to share the sample internally with your reviewer. If a client restricts disclosure, ask for a redacted or illustrative alternative clearly labelled as such. Ask how the vendor handles authority comments, equipment changes, and revision control.
Then send a short description of your own project: site location, system type, approximate DC and AC size, equipment status, roof or ground conditions, AHJ and utility, desired issue stage, and any deadline. This lets the vendor explain which sample is actually comparable. If a supplier replies with only a generic brochure and no scope discussion, you still lack evidence about its fit for this assignment.
The decision after the sample review
A good sample can justify a deeper technical conversation, a reference check where authorised, or a small paid trial with defined inputs and acceptance criteria. It cannot prove that every future plan set will be approved, nor can a single error prove that a firm cannot improve. Compare the vendor’s explanation, revision process, and willingness to identify limits with the risk level of your actual project. For a complex roof or AHJ, seek the appropriate licensed review and project-specific evidence.
If you want to discuss a US solar drawing assignment, send the site, authority, equipment status, desired issue stage, and sample questions through the Heaven Designs project contact form. We can review the available inputs and reply with a proposed scope, price, and delivery date. For a broader engineering-quality review, see the eight indicators of solar design quality.
Sources and application note
Checked 23 November 2026: DOE rooftop permitting and inspection, NYC owner solar requirements, NYC registrant solar requirements, and the historical California Solar Permitting Guidebook. The scorecard is an editorial procurement tool. Confirm current adopted code, utility rules, and professional requirements with the actual AHJ.