US Solar Codes P3 Reference 3 min read Reviewed July 8, 2026 Akash Hirpara Akash Hirpara

CSA C22.2

CSA C22.2 is the Canadian electrical safety standard series, the Canadian counterpart to UL listings. Learn which parts apply to PV modules and inverters.

Quick answer

CSA C22.2 is the Canadian Standards Association's series of product safety standards for electrical equipment, referenced by the Canadian Electrical Code (CSA C22.1). For solar, CSA C22.2 No. 61730 covers PV module safety and C22.2 No. 107.1 covers power conversion equipment such as inverters. Canadian inspectors expect this certification.

Key Takeaways

  • CSA C22.2 = Canadian electrical safety standard series.
  • Equivalent in scope to UL listings used in the US.
  • Joint UL/CSA listings are common in North America, so many products carry both marks.
  • Required for solar equipment installed in Canada; not a substitute for a US UL listing on a US project.

What CSA C22.2 Covers

CSA C22.2 is not a single document but a series of standards published by the Canadian Standards Association, each addressing a specific category of electrical equipment, inverters, PV modules, junction boxes, connectors, and racking hardware among them.

A product is “CSA C22.2 listed” when an accredited testing lab has confirmed it meets the relevant part of that series for construction, insulation, grounding, and fault protection. In practice, the standard plays the same role in Canada that UL listings play in the US: it’s the baseline evidence an AHJ or utility asks for before approving equipment for interconnection.

Why Joint UL/CSA Listings Matter

Because the underlying safety requirements in the US and Canadian standards overlap heavily, testing labs frequently run a single evaluation and issue a joint UL/CSA listing report. That’s why it’s common to see both a UL number and a CSA C22.2 designation printed on the same inverter or module datasheet.

For an engineer specifying equipment on a cross-border portfolio, that joint mark is the quickest way to confirm a product is eligible for permitting in either country without needing a second round of certification.

For a look at how equipment listings show up inside an actual permit package, the solar permit submission checklist walks through the inverter and module documentation an AHJ expects to see, including the UL 1741 listing confirmation that CSA C22.2 mirrors north of the border.

If you’re comparing electrical safety standards across module and inverter equipment more broadly, QBITS Energy’s guide to solar inverter certification standards covers the IEC-based listings used outside North America, and its IEC 62109 entry is a useful point of comparison for the inverter safety requirements CSA C22.2 and UL 1741 both address.

For the US equivalents, see UL 1741 for inverters and UL 61730 for modules. The module safety standards comparison sets the North American and IEC listings side by side.

Disclosure: Qbits Energy is a Heaven Designs group company.

Frequently Asked Questions

3 commonly searched questions about CSA C22.2.

Is CSA C22.2 the same as UL certification?
They are separate national standards, but many are harmonized, so one round of testing can produce both a UL and a CSA listing. A product marked cULus or CSA-US has been evaluated for both Canada and the United States by an accredited certification body.
Which CSA C22.2 parts apply to solar PV?
The most common are CSA C22.2 No. 61730-1 and -2 for module construction and safety testing, and CSA C22.2 No. 107.1 for inverters and other power conversion equipment. Racking, connectors and disconnects carry their own listings under related Canadian standards.
Do Canadian solar permits require CSA-certified equipment?
Yes. Canadian electrical inspection authorities require equipment to be certified by an accredited body to the applicable Canadian standard. Uncertified modules or inverters usually need a costly field evaluation, so permit drawings should list equipment carrying a recognized Canadian certification mark.

Need engineering-backed solar designs?

Heaven Designs prepares solar drawings, structural calculations, electrical engineering documents, and project-specific permit plan sets.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.

Get a quote WhatsApp