IS 16221

IS 16221 is India's solar inverter safety standard, adopted from IEC 62109. See IS 16221 Part 1 and Part 2, BIS registration rules and companion standards.

Quick answer

IS 16221 is the Bureau of Indian Standards safety standard for power converters used in solar PV systems, adopted from IEC 62109. Part 1 (2015) sets general safety requirements and Part 2 (2015) adds rules specific to inverters. Grid-connected inverters sold in India need BIS registration against IS 16221 (Part 2) before installation on DISCOM-connected projects.

IS 16221 is the Indian Standard that solar inverter manufacturers, EPC procurement teams and permit designers check for inverter safety. This entry explains what IS 16221 Parts 1 and 2 cover, how they map to IEC 62109, and which companion standards a grid-connected inverter needs for BIS registration in India.

Key Takeaways

  • IS 16221 = Indian inverter safety standard.
  • Equivalent to IEC 62109.
  • Grid-tied inverters also need IS 16169 (anti-islanding) and IS 17980 (efficiency).
  • Required for BIS Compulsory Registration of solar inverters.
  • Inverters are not on ALMM; BIS registration is the approval route.

What is IS 16221?

IS 16221 is a safety standard, not a performance one, it addresses how an inverter protects installers, technicians, and building occupants from electric shock, fire, and overheating rather than how efficiently the inverter converts DC to AC. That distinction matters when reading a datasheet: an inverter’s IS 16221 mark speaks to enclosure protection, insulation resistance, and fault-clearing behavior, while efficiency is tested separately under IS 17980 and anti-islanding under IS 16169.

All three sit under the same BIS registration, so a manufacturer usually tests a model against them in one certification cycle.

Where IS 16221 Fits in the Compliance Chain

For a project team, IS 16221 rarely appears as a standalone checkpoint, it surfaces indirectly, through the equipment list. A DISCOM or CEIG reviewer checking a net metering or interconnection application generally confirms that the specified inverter model carries a valid BIS registration covering IS 16221 (Part 2). Unlike modules, inverters are not on the ALMM list, so BIS registration is the main equipment check.

Specifying an inverter that hasn’t completed IS 16221 certification, common with newer models entering the Indian market, is one of the more avoidable reasons a permit package gets sent back for equipment substitution late in the review cycle.

Since IS 16221 sits inside the broader BIS certification framework for solar equipment, our glossary entry on BIS Solar walks through how IS 16221 relates to the other IS standards (modules, cables, earthing) that make up a complete compliance package. For the state-by-state view of how equipment certification gaps affect approval timelines in practice, see Solar Permits India: State-Wise Processing Times 2026.

On the manufacturer side, Qbits Energy’s breakdown of solar inverter regulatory compliance in India and its IEC 62109 glossary entry go deeper into the international standard that IS 16221 is modeled on.

Disclosure: Qbits Energy is a Heaven Designs group company.

Frequently Asked Questions

4 commonly searched questions about IS 16221.

What is IS 16221 Part 2?
IS 16221 (Part 2):2015 is the inverter-specific part of the standard, equivalent to IEC 62109-2:2011. It covers shock, fire and mechanical hazards particular to PV inverters, including protection against faults on the PV array side, and is the part named in BIS registration.
Is IS 16221 mandatory for solar inverters in India?
Yes. Solar PV inverters fall under BIS Compulsory Registration, and the registration is tested against IS 16221 (Part 2). Without a valid BIS registration number, an inverter should not be supplied for grid-connected or subsidised projects, and DISCOMs may reject it.
Which other standards do grid-connected inverters need with IS 16221?
Grid-connected inverters are also tested to IS 16169 for anti-islanding, equivalent to IEC 62116, and IS 17980 for efficiency, equivalent to IEC 62891. IS 16221 covers safety only. Check the BIS certificate lists every standard the project specification requires.
Is IS 16221 the same as IEC 62109?
IS 16221 is India's adoption of IEC 62109, so the scope and test methods are closely aligned. A manufacturer holding IEC 62109 reports still needs testing at a BIS-recognised lab in India to obtain the Indian registration.

Need engineering-backed solar designs?

Heaven Designs prepares solar drawings, structural calculations, electrical engineering documents, and project-specific permit plan sets.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.

Get a quote WhatsApp