SECI tender deadlines move often, and the engineering behind a bid takes longer than most bid teams plan for. This page lists the open SECI tender 2026 notices relevant to solar and storage EPCs and developers. Each entry is taken from the SECI tenders page as it read on 6 October 2026.

Quick answer. As of 6 October 2026, SECI’s tenders page lists open solar, storage and wind notices. The 700 MW ISTS-connected solar RfS (C&I-1) is due 15 October. The 800 MW / 3,200 MWh BESS RfS (ESS-IV) is due 30 October. A 60 MW solar EPC tender at Gaya, Bihar, is due 12 November. Confirm every date on seci.co.in, because corrigenda change them.

TL;DR

  • Every tender below is listed on seci.co.in. Nothing here comes from press reports alone.
  • Dates are bid due dates as shown on 6 October 2026. Check the tender detail page for amendments.
  • Developer RfS bids (tariff-based) and EPC tenders need different engineering packages.
  • Rooftop RESCO tranches are small in size but still need site-level layouts.
  • Start yield and layout work as soon as an RfS is issued, not after the pre-bid meeting.

This page is for bid managers at developers and EPCs who track SECI work. For how engineering inputs move a tariff bid, read our guide on SECI tariff math.

Open SECI Tender 2026 Notices for Solar and Storage

The table lists energy tenders from the SECI tenders page on 6 October 2026. Non-energy notices, such as IT systems and office leasing, are left out.

Tender (as titled by SECI, shortened)ReferenceCapacityPublishedBid due
EPC of ISTS-connected solar PV plant at Gaya, BiharSECI/C&P/OP/11/0007/26-2760 MW (AC)30/09/202612/11/2026
Rooftop solar, RESCO mode (RTSPV Tranche XIV)SECI/C&P/IPP/11/0009/26-2711,159 kW01/10/202610/11/2026
Rooftop solar, RESCO mode, CAU Imphal (RTSPV T-XIII)SECI/C&P/IPP/11/0008/26-274,083.75 kW18/09/202602/11/2026
Standalone BESS supply (SECI-ESS-IV)SECI/C&P/IPP/15/0010/26-27800 MW / 3,200 MWh01/10/202630/10/2026
Wind power project (Package 2: Wind)SECI/C&P/OP/11/0003/26-2745.6 MW16/07/202623/10/2026
ISTS-connected solar PV under TBCB (C&I-1)SECI/C&P/IPP/15/0009/26-27700 MW03/09/202615/10/2026
Assured peak supply under CfD (SECI-CfD-I)SECI/C&P/IPP/13/0002/26-271,000 MWh (500 MW × 2 h)19/04/202614/10/2026

Source: Solar Energy Corporation of India, tenders list, accessed 6 October 2026. TBCB means tariff-based competitive bidding. CfD means contract for difference.

Recently closed notices

The same page showed notices whose dates had passed by 6 October 2026. They included the 70 MW solar plus 25 MW / 50 MWh BESS EPC package at Ramagiri, Andhra Pradesh (due 30/09/2026). It also showed a 922.635 kW rooftop CAPEX tender (due 04/10/2026). Check the detail page for any extension before you rule one out.

What Each SECI Tender Type Needs From Engineering

The SECI list mixes three kinds of work. Each needs a different engineering package at bid stage.

Tender typeWho bidsEngineering needed before bid
Tariff-based RfS (solar, peak supply, BESS)DevelopersSite-level yield model, P50/P90, layout, loss assumptions, connectivity plan
EPC tender (Gaya, Ramagiri)EPC contractorsLayout to the client’s site data, BOQ, civil and structural concept, cost build-up
Rooftop RESCO tranchesRooftop developersRoof-by-roof layouts, shading checks, yield per site, structural checks

Tariff-based solar and storage RfS

For a solar RfS, your bid tariff rests on the energy yield you can defend. That means a PVsyst model with stated losses and a P90 figure your lender accepts. For storage or peak-supply bids, you also need a charge and discharge plan that meets the supply profile in the RfS.

ISTS connectivity matters for both. Our glossary entry on CTU and STU explains the split between the central and state transmission utilities, and our STU vs CTU transmission planning guide covers how that choice shapes a bid. Grid connection design must also meet the Central Electricity Authority (CEA) technical standards for connectivity.

EPC tenders

EPC tenders ask you to build to SECI’s specification at a named site. Price risk sits in the BOQ, civil work and cable runs. Our ground-mount solar design service covers bid-stage layouts and quantities for this kind of tender.

Rooftop RESCO tranches

RESCO tranches combine many small roofs. Each roof needs its own layout, shading check and structural review. A wrong roof survey on one building can make that site unviable after award.

A Bid Engineering Timeline Against SECI Due Dates

Work backward from the bid due date. The steps below are a planning template, not a SECI requirement.

  1. RfS issued: download the document and the site or connectivity data.
  2. First week: draft layout and first yield run on agreed loss assumptions.
  3. Before the pre-bid meeting: list questions on site data, connectivity and specification.
  4. After clarifications: update the model for any change in the RfS or its amendments.
  5. Final week: freeze yield, BOQ and cost model. Check module eligibility against the MNRE ALMM list.

Our SECI auction engineering playbook covers the deliverable stack in more depth, and our EPC bid-stage engineering checklist lists what to freeze before submission. For the module side, read ALMM and its BOQ impact.

How to Track SECI Tender Changes

SECI posts amendments, corrigenda and pre-bid replies on each tender’s detail page. Due dates on the list can change after you first read them.

  • Check the detail page weekly for each tender you follow.
  • Keep a dated log of every amendment you read.
  • Rerun the yield or cost model when an amendment changes capacity, site or specification.

The same page lists calls under the National Green Hydrogen Mission. They sit outside the scope of this guide.

FAQ

Where is the official SECI tender list? On seci.co.in under Tenders. Use it as the source of record. Trade press is useful for alerts but can lag behind amendments.

Does SECI publish a full-year tender calendar for 2026? We did not find a published full-year calendar on seci.co.in. This page lists notices as they appear on the tenders list.

Can a small EPC bid for SECI work? EPC tenders and rooftop tranches set their own eligibility terms. Read the qualification section of each document before you start engineering.

Next Step

If you plan to bid on one of the tenders above, start the yield and layout work now. Send the RfS number and site data through our project quote form, and we reply within 1 business day. Sample bid-stage reports are available through our design samples page.

Last checked against seci.co.in: 6 October 2026. Next review: November 2026.