Module frame bonding is the electrical connection of every PV module's metal frame to the equipment grounding conductor so a fault cannot leave the frame energised. In the United States it is required by NEC 690.43 and is usually achieved with UL 2703 listed racking, lay-in lugs, or bonding washers that inspectors verify during plan review.
Key Takeaways
- Module frame bonding = electrical ground path for module frames.
- Required by NEC 690.43.
- UL 2703 racking provides integrated bonding.
- Connects to EGC for shock safety.
- Documented on the SLD.
Why the Frame Needs a Ground Path
Every PV module has an aluminum frame sitting right next to insulated DC conductors and connectors. Insulation on any of those leads can degrade over years of thermal cycling and UV exposure, and once it fails, the metal frame can become an energized, touchable surface.
Bonding ties every module frame in the array, not just the array boundary, to the equipment grounding conductor (EGC), so a fault current has a continuous, low-impedance path back to the source instead of stopping at an isolated, live frame. That continuous path is also what lets upstream overcurrent protection or ground-fault detection actually see and clear the fault.
How Bonding Is Implemented
NEC 690.43 does not mandate one hardware solution, it just requires a bonding path that meets the code’s continuity and sizing rules. In practice, most systems use one of three approaches:
- UL 2703 listed racking: the rail and clamp system itself is tested and listed with integrated frame-to-rail and rail-to-rail bonding, which is why it is the default choice on most commercial and utility-scale arrays.
- Copper lay-in lugs with through-bolts: a discrete bonding jumper is lugged directly to a drilled or through-bolted point on each frame.
- Bonding washers (e.g., WEEB-style), a serrated washer under the module-to-rail fastener bites through the frame’s anodized coating to make the ground connection without a separate jumper at every module.
Whichever method is used, the bonding scheme and jumper sizing need to show up on the electrical single-line diagram and grounding details, since that is what a plan reviewer or inspector checks the installed array against.
Related Reading
Module frame bonding is one piece of a broader grounding and safety picture that also includes the equipotential bonding between racking, module frames, and other array metalwork, and the sizing of the EGC itself back to the grounding electrode system.
Once bonded, the ground path from the array typically terminates near the combiner box, where it is documented alongside conductor and overcurrent protection details. For teams assembling that documentation package for a permit set, our breakdown of solar SLD software covers how NEC-compliant single-line diagrams, including grounding and bonding call-outs, get auto-generated rather than redrawn by hand for every project.
Frequently Asked Questions
3 commonly searched questions about Module Frame Bonding.
Why does an aluminium module frame need to be bonded?
Is UL 2703 racking required for module bonding?
Where is module frame bonding shown on permit drawings?