Solar Design Services in California

One engineering partner across the whole project lifecycle in California. Proposal drawings to win the job, permit sets to get it approved, detailed engineering to get it built.

45,000
MW installed in CA
300+
EPCs served worldwide
50+
In-house engineers
11 MW
Largest documented project

Client and engineer figures are portfolio wide across 15 countries. Installed capacity is California specific.

CALIFORNIA DESIGN SERVICES

Engineering capacity for the California market

California work splits cleanly into two problems. Residential is a volume and speed game in the most competitive installer market in the country, now almost always with storage attached because net billing rewards self-consumption over export. Commercial and industrial is a structural and interconnection problem, where seismic category and utility rules drive the engineering.

Solar design and engineering work for a California commercial project

MARKET CONTEXT

The California solar market

California carries the largest installer population in the country and the deepest competition, which means turnaround is a commercial weapon rather than a convenience. The shift to net billing under NEM 3.0 changed the economics: export credit fell sharply, self-consumption became the value driver, and battery attach rates rose steeply. Most residential work here is now solar plus storage, and that pulls NEC 706 and load calculations into sets that used to be array-only.

01

Three code documents govern one array. The California Fire Code pathway and setback rules routinely remove rows that a purely electrical design would keep.

02

Seismic design category D to E means attachment and framing detail get real scrutiny, especially in Los Angeles where plan check applies regardless of system size.

03

Net billing under NEM 3.0 made storage the default rather than the upsell, so most sets now carry battery scope and NEC 706 compliance.

04

Municipal utilities such as LADWP and SMUD sit outside NEM 3.0 entirely, so two projects a few miles apart can face completely different export rules.

INTERCONNECTION

California utilities we design for

Export compensation decides how a system should be sized and whether storage belongs in the design, which makes it an engineering input rather than a sales detail.

Utility interconnection and export rules in California
Utility Territory Export and compensation
Pacific Gas and Electric Northern and central California Net billing under NEM 3.0, export credited at hourly avoided cost
Southern California Edison Most of southern California outside LA city and San Diego Net billing under NEM 3.0, avoided-cost export values
San Diego Gas and Electric San Diego County and southern Orange County Net billing under NEM 3.0, highest retail rates in the state
LADWP City of Los Angeles Municipal utility, retains its own net metering rather than NEM 3.0
SMUD Sacramento County Municipal utility with its own solar and storage rate structure

ENGINEERING CONDITIONS

What governs design in California

These conditions decide the structural approach, the racking selection and often the layout itself. We verify them per site rather than applying a regional default.

Wind

Generally 85 to 110 mph design wind speed, higher through mountain passes and the Banning corridor

Snow

Negligible on the coast and in the valleys, significant in the Sierra Nevada where ground snow loads climb steeply with elevation

Seismic

Seismic design categories D through E across most populated areas, the highest routine seismic demand in the country

Also governing

Wildfire urban interface zones add fire access and material requirements, and coastal sites need corrosion consideration

Compliance scope in California

  • Title 24 Part 6 energy standards, including solar-ready and PV mandate provisions
  • California Fire Code Chapter 12 ridge setbacks and access pathways
  • California Residential Code structural provisions
  • Local seismic plan-check overlays, notably in Los Angeles

California authorities we file with

Los Angeles Department of Building and SafetySan Diego Development Services DepartmentSan Francisco Department of Building InspectionLos Angeles County Public WorksSacramento County Building Permits

Each has its own submittal route and recurring review comments. Full detail on the California permit design page.

SAMPLE DELIVERABLES

Output from across the stack

Pages from real projects, one per discipline.

Photorealistic 3D solar design render for a commercial roof in California Pre-design
3D pre-design. Client-facing render before engineering starts.
Three line electrical diagram from a permit plan set for a California project Permitting
Permit design. Three line diagram with sizing, protection and rapid shutdown.
STAAD Pro load combination analysis of a solar mounting structure Engineering
Structural. STAAD Pro load combination analysis, member by member.
Aerial view of a utility scale ground mount solar installation Ground mount
Ground mount. Terrain analysis and row spacing at scale.

SOFTWARE

What we design in

Licensed, current and staffed. You do not carry the software cost or the training overhead.

PVsyst

Yield simulation and bankable production reports with full loss breakdown.

HelioScope

Rapid layout and production modelling with string level detail.

CAD

All drafting output, plan sets and construction drawings.

STAAD Pro

Structural analysis and load verification against California wind, snow and seismic cases.

Aurora Solar

Proposal design and shade analysis, including inside your own account.

SketchUp

3D modelling for pre-design and client-facing visualisation.

ENGAGEMENT MODELS

Four ways to work with us

Per project

Send one job, pay for one job. No retainer, no minimum, no onboarding fee.

Testing our output, or occasional demand.

Named designer

One designer owns your account and learns your title block and the California authorities you file with most.

Regular weekly volume.

Dedicated team

Agreed daily capacity with a delivery SLA, functioning as your outsourced design department.

High volume operations.

Overflow support

On call capacity alongside your existing in-house designer, absorbing peak months.

Teams that lose deals when busy.

Working with an India based partner on California projects

We are based in Surat, Gujarat, and our California clients are not. Our engineers work hours that overlap US time zones, so work sent at the end of your day is on your desk the next morning.

On code, the same engineers who produce CEIG approval drawings for an Indian utility also produce NEC compliant sets for US installers. Working across code frameworks daily is why California specifics do not get lost in handoff. Work is covered by NDA and intellectual property transfers to you.

GET STARTED

Get a California Design Services Quote

Tell us what stage you are at and what you need. No retainer, no minimum volume, and you can start with a single California project.

  • We reply within 1 business day
  • Plan check comments handled with you
  • No obligation, no retainer to start
“Heaven Designs has been an exceptional partner for our EPC projects. Their turnaround time and design accuracy are unmatched. We have completed multiple projects with zero design rework. Highly recommended for any solar EPC company looking for reliable design support.”
Mr. Rahul Mehta , Enerture Solar
Case study: 11 MW DC tin-shed rooftop, Gulf country →

We reply within 1 business day, Mon to Sun, 8 AM to 6 PM IST. By submitting you agree to our Privacy Policy.

FAQ

California Solar Design Services FAQs

What solar design services do you provide in California?
Proposal design for the sales stage, permit plan sets for California authorities, 3D pre-design and shade studies, detailed engineering for rooftop and ground mount, civil and structural engineering with STAAD Pro verification, and yield and technical reports. Most California installers start with one service and expand once turnaround and quality are proven.
Do you understand California code and utility requirements?
Yes, and it is the substance of the work rather than a claim. California builds on the National Electrical Code through the California Electrical Code, then layers the Title 24 energy standards and the California Fire Code on top. Three documents govern a single rooftop array, and the fire code is usually what reshapes the layout.
Which California utilities do you prepare interconnection drawings for?
Pacific Gas and Electric, Southern California Edison, San Diego Gas and Electric, LADWP, SMUD. Each expects its own diagram format and documentation, and export rules differ between them, which changes both the sizing case and what the drawings must show.
What is driving solar demand in California right now?
California carries the largest installer population in the country and the deepest competition, which means turnaround is a commercial weapon rather than a convenience. The shift to net billing under NEM 3.0 changed the economics: export credit fell sharply, self-consumption became the value driver, and battery attach rates rose steeply. Most residential work here is now solar plus storage, and that pulls NEC 706 and load calculations into sets that used to be array-only.
Can you handle commercial and MW-scale work in California?
Yes. Commercial and industrial work brings structural calculations, equipment coordination and interconnection complexity. Our largest documented project is an 11 MW DC rooftop installation on tin shed structures, which required structural verification across dozens of shed roofs alongside the electrical design.
How do you quality check drawings before delivery?
A second engineer reviews every set against a jurisdiction specific checklist before it leaves us. The reviewer is not the person who drew it, because the fastest way to miss a setback error is to check your own work. Structural output is verified in STAAD Pro rather than assumed from a racking table.
Who owns the drawings and the intellectual property?
You do. Work is covered by NDA and all intellectual property in the deliverables transfers to you. We do not reuse your drawings, your customer data or your templates for anyone else.
Can we start with a single California project?
Yes. No retainer, no minimum volume, no onboarding fee. Most clients send one project, check the output, then scale.
What structural conditions do you design for in California?
Wind: generally 85 to 110 mph design wind speed, higher through mountain passes and the Banning corridor. Snow: negligible on the coast and in the valleys, significant in the Sierra Nevada where ground snow loads climb steeply with elevation. Seismic: seismic design categories D through E across most populated areas, the highest routine seismic demand in the country. Also governing: wildfire urban interface zones add fire access and material requirements, and coastal sites need corrosion consideration. These decide the racking selection and attachment schedule, so we verify them per site rather than applying a regional default.
What compliance requirements apply in California?
Title 24 Part 6 energy standards, including solar-ready and PV mandate provisions. California Fire Code Chapter 12 ridge setbacks and access pathways. California Residential Code structural provisions. Local seismic plan-check overlays, notably in Los Angeles. We work from these rather than a national template, because each can produce a review comment on an otherwise sound design.
Which California authorities do you work with?
Los Angeles Department of Building and Safety (City of Los Angeles): structural plan check applies to rooftop systems regardless of size because of seismic design category. Expect the framing detail to be examined closely. San Diego Development Services Department (City of San Diego): runs an established expedited residential pathway, but combination permits for solar plus storage are reviewed as a single package. San Francisco Department of Building Inspection (City and County of San Francisco): dense urban roofs, frequent historic overlays, and fire access pathways that often decide the module count outright. Los Angeles County Public Works (Unincorporated LA County): separate from LADBS with its own submittal route. Confusing the two is a common first-time filing error. Sacramento County Building Permits (Sacramento region): coordinates with SMUD rather than an investor-owned utility, so the interconnection paperwork differs from PG&E territory.
How does NEM 3.0 change the design of a California solar system?
Net billing credits exports at hourly avoided cost rather than retail, so value comes from consuming your own generation instead of sending it to the grid. In practice that means most systems now include a battery, the array is sized against the load profile rather than annual consumption, and the plan set carries NEC 706 storage scope plus a load calculation that array-only sets did not need.
What do the California Fire Code setbacks actually require?
Ridge setbacks and access pathways sized so firefighters can reach and ventilate the roof, with clearances at hips and valleys. The practical effect is that the compliant layout is usually smaller than the geometrically possible one. We resolve setbacks before finalising module count, because doing it the other way round is how a customer signs for a system that then loses rows at plan check.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.