Solar Design Services in Texas

One engineering partner across the whole project lifecycle in Texas. Proposal drawings to win the job, permit sets to get it approved, detailed engineering to get it built.

22,000
MW installed in TX
300+
EPCs served worldwide
50+
In-house engineers
11 MW
Largest documented project

Client and engineer figures are portfolio wide across 15 countries. Installed capacity is Texas specific.

TEXAS DESIGN SERVICES

Engineering capacity for the Texas market

Texas rewards partners who understand the administrative geography as much as the engineering. Residential volume concentrates in the Houston, Dallas, Austin and San Antonio metros, each with its own review culture and, in Austin and San Antonio, a municipal utility running its own interconnection process. Commercial and industrial work runs into wind, hail and extreme ambient temperature all at once.

Solar design and engineering work for a Texas commercial project

MARKET CONTEXT

The Texas solar market

Texas has grown into one of the largest solar markets in the country across residential, commercial and utility scale, but it is administratively the most fragmented. The deregulated retail market means export compensation is set by the customer retail provider rather than the wires utility, so the same array earns differently depending on a contract the installer does not control. For design partners, the real work is tracking 254 counties worth of local practice rather than one state rulebook.

01

There is no statewide permitting process. With 254 counties and municipal enforcement, local practice rather than state code determines what a compliant submittal looks like.

02

Wires utilities like Oncor and CenterPoint do not set export compensation. The customer retail electric provider does, so the economics vary by contract rather than by territory.

03

Designated coastal catastrophe counties require windstorm certification, which is a documentation stream that does not exist inland.

04

A Texas professional engineer licence is required to seal Texas work, with no practical out-of-state route.

INTERCONNECTION

Texas utilities we design for

Export compensation decides how a system should be sized and whether storage belongs in the design, which makes it an engineering input rather than a sales detail.

Utility interconnection and export rules in Texas
Utility Territory Export and compensation
Oncor Electric Delivery Dallas, Fort Worth and much of north Texas Wires-only delivery utility. Export compensation comes from your retail electric provider, not Oncor
CenterPoint Energy Houston metropolitan area Delivery utility. Buyback depends on the retail provider the customer has chosen
AEP Texas Corpus Christi, Abilene, and south and west Texas Delivery utility, retail provider sets the buyback plan
Austin Energy City of Austin Municipal utility with its own value-of-solar tariff rather than retail netting
CPS Energy San Antonio Municipal utility running its own solar programme and interconnection process

ENGINEERING CONDITIONS

What governs design in Texas

These conditions decide the structural approach, the racking selection and often the layout itself. We verify them per site rather than applying a regional default.

Wind

Wide range. Inland design speeds are moderate, but the Gulf coast runs high and designated catastrophe counties require windstorm certification

Snow

Minimal across most of the state, with light ground snow loads in the panhandle

Seismic

Low across almost all of Texas

Also governing

Hail is a material design and insurance consideration through north Texas, and extreme summer ambient temperatures drive conductor derating

Compliance scope in Texas

  • Municipal code adoption varies widely, with no uniform statewide cycle
  • Windstorm certification requirements in designated coastal catastrophe counties
  • Municipal utility jurisdictions such as Austin Energy and CPS Energy set their own interconnection terms

Texas authorities we file with

Houston Permitting CenterDallas Development ServicesAustin Development Services DepartmentSan Antonio Development ServicesUnincorporated county jurisdictions

Each has its own submittal route and recurring review comments. Full detail on the Texas permit design page.

SAMPLE DELIVERABLES

Output from across the stack

Pages from real projects, one per discipline.

Photorealistic 3D solar design render for a commercial roof in Texas Pre-design
3D pre-design. Client-facing render before engineering starts.
Three line electrical diagram from a permit plan set for a Texas project Permitting
Permit design. Three line diagram with sizing, protection and rapid shutdown.
STAAD Pro load combination analysis of a solar mounting structure Engineering
Structural. STAAD Pro load combination analysis, member by member.
Aerial view of a utility scale ground mount solar installation Ground mount
Ground mount. Terrain analysis and row spacing at scale.

SOFTWARE

What we design in

Licensed, current and staffed. You do not carry the software cost or the training overhead.

PVsyst

Yield simulation and bankable production reports with full loss breakdown.

HelioScope

Rapid layout and production modelling with string level detail.

CAD

All drafting output, plan sets and construction drawings.

STAAD Pro

Structural analysis and load verification against Texas wind, snow and seismic cases.

Aurora Solar

Proposal design and shade analysis, including inside your own account.

SketchUp

3D modelling for pre-design and client-facing visualisation.

ENGAGEMENT MODELS

Four ways to work with us

Per project

Send one job, pay for one job. No retainer, no minimum, no onboarding fee.

Testing our output, or occasional demand.

Named designer

One designer owns your account and learns your title block and the Texas authorities you file with most.

Regular weekly volume.

Dedicated team

Agreed daily capacity with a delivery SLA, functioning as your outsourced design department.

High volume operations.

Overflow support

On call capacity alongside your existing in-house designer, absorbing peak months.

Teams that lose deals when busy.

Working with an India based partner on Texas projects

We are based in Surat, Gujarat, and our Texas clients are not. Our engineers work hours that overlap US time zones, so work sent at the end of your day is on your desk the next morning.

On code, the same engineers who produce CEIG approval drawings for an Indian utility also produce NEC compliant sets for US installers. Working across code frameworks daily is why Texas specifics do not get lost in handoff. Work is covered by NDA and intellectual property transfers to you.

GET STARTED

Get a Texas Design Services Quote

Tell us what stage you are at and what you need. No retainer, no minimum volume, and you can start with a single Texas project.

  • We reply within 1 business day
  • Plan check comments handled with you
  • No obligation, no retainer to start
“Heaven Designs has been an exceptional partner for our EPC projects. Their turnaround time and design accuracy are unmatched. We have completed multiple projects with zero design rework. Highly recommended for any solar EPC company looking for reliable design support.”
Mr. Rahul Mehta , Enerture Solar
Case study: 11 MW DC tin-shed rooftop, Gulf country →

We reply within 1 business day, Mon to Sun, 8 AM to 6 PM IST. By submitting you agree to our Privacy Policy.

FAQ

Texas Solar Design Services FAQs

What solar design services do you provide in Texas?
Proposal design for the sales stage, permit plan sets for Texas authorities, 3D pre-design and shade studies, detailed engineering for rooftop and ground mount, civil and structural engineering with STAAD Pro verification, and yield and technical reports. Most Texas installers start with one service and expand once turnaround and quality are proven.
Do you understand Texas code and utility requirements?
Yes, and it is the substance of the work rather than a claim. Texas has no single statewide solar permitting process. Code adoption and enforcement sit with municipalities and counties, and there are 254 counties. Two projects an hour apart can face different adopted code cycles, different submittal formats, and different inspection expectations.
Which Texas utilities do you prepare interconnection drawings for?
Oncor Electric Delivery, CenterPoint Energy, AEP Texas, Austin Energy, CPS Energy. Each expects its own diagram format and documentation, and export rules differ between them, which changes both the sizing case and what the drawings must show.
What is driving solar demand in Texas right now?
Texas has grown into one of the largest solar markets in the country across residential, commercial and utility scale, but it is administratively the most fragmented. The deregulated retail market means export compensation is set by the customer retail provider rather than the wires utility, so the same array earns differently depending on a contract the installer does not control. For design partners, the real work is tracking 254 counties worth of local practice rather than one state rulebook.
Can you handle commercial and MW-scale work in Texas?
Yes. Commercial and industrial work brings structural calculations, equipment coordination and interconnection complexity. Our largest documented project is an 11 MW DC rooftop installation on tin shed structures, which required structural verification across dozens of shed roofs alongside the electrical design.
How do you quality check drawings before delivery?
A second engineer reviews every set against a jurisdiction specific checklist before it leaves us. The reviewer is not the person who drew it, because the fastest way to miss a setback error is to check your own work. Structural output is verified in STAAD Pro rather than assumed from a racking table.
Who owns the drawings and the intellectual property?
You do. Work is covered by NDA and all intellectual property in the deliverables transfers to you. We do not reuse your drawings, your customer data or your templates for anyone else.
Can we start with a single Texas project?
Yes. No retainer, no minimum volume, no onboarding fee. Most clients send one project, check the output, then scale.
What structural conditions do you design for in Texas?
Wind: wide range. Inland design speeds are moderate, but the Gulf coast runs high and designated catastrophe counties require windstorm certification. Snow: minimal across most of the state, with light ground snow loads in the panhandle. Seismic: low across almost all of Texas. Also governing: hail is a material design and insurance consideration through north Texas, and extreme summer ambient temperatures drive conductor derating. These decide the racking selection and attachment schedule, so we verify them per site rather than applying a regional default.
What compliance requirements apply in Texas?
Municipal code adoption varies widely, with no uniform statewide cycle. Windstorm certification requirements in designated coastal catastrophe counties. Municipal utility jurisdictions such as Austin Energy and CPS Energy set their own interconnection terms. We work from these rather than a national template, because each can produce a review comment on an otherwise sound design.
Which Texas authorities do you work with?
Houston Permitting Center (City of Houston): large-volume electronic submittal operation. Expects its own sheet conventions and reviews solar as an electrical permit with structural attachments. Dallas Development Services (City of Dallas): separate building and electrical review tracks, so incomplete structural documentation stalls the whole package rather than one part of it. Austin Development Services Department (City of Austin): coordinates with Austin Energy on interconnection alongside the building permit, so the utility paperwork and permit run in parallel. San Antonio Development Services (City of San Antonio): works alongside CPS Energy programme requirements, which are distinct from the investor-owned utility model elsewhere in the state. Unincorporated county jurisdictions (Much of rural Texas): many counties have limited or no building permit requirement for solar, which shifts the compliance burden onto the utility interconnection review instead.
Does Texas have net metering?
Not as a statewide requirement. Texas is a deregulated retail market, so the wires utility such as Oncor or CenterPoint delivers power while the customer retail electric provider sets any solar buyback plan. Two identical arrays on the same street can earn different export credit because the owners chose different providers. Municipal utilities like Austin Energy and CPS Energy sit outside this and run their own programmes.
What is windstorm certification and when does it apply?
Designated coastal catastrophe counties require certification that construction meets windstorm standards, which is a documentation and inspection stream separate from the building permit. It applies to solar attachments on the seaward counties and does not exist for inland projects, so a set drawn for a Dallas roof is not a set that works on the Gulf coast.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.