Solar Design Services in New York

One engineering partner across the whole project lifecycle in New York. Proposal drawings to win the job, permit sets to get it approved, detailed engineering to get it built.

6,200
MW installed in NY
300+
EPCs served worldwide
50+
In-house engineers
11 MW
Largest documented project

Client and engineer figures are portfolio wide across 15 countries. Installed capacity is New York specific.

NEW YORK DESIGN SERVICES

Engineering capacity for the New York market

New York rewards a partner who can work both halves of the state. City work is dense flat-roof engineering with parapets, access constraints, historic overlays and congested utility networks. Upstate work is snow loading, rural feeder capacity and Unified Solar Permit residential volume. Community solar has grown substantially in the upstate territories, which brings a different documentation set again.

Solar design and engineering work for a New York commercial project

MARKET CONTEXT

The New York solar market

New York is really two markets sharing a state line. New York City is dense, expensive, administratively heavy, and dominated by flat roofs with parapets, limited access and constrained utility networks. Upstate is a snow-load and rural-feeder market where the Unified Solar Permit has genuinely reduced friction on residential work. NYSERDA programme support has sustained volume through both, and community solar has grown substantially in the upstate utility territories.

01

New York City requires filings to be made by a licensed design professional, so a design partner is not optional on city work in the way it can be elsewhere.

02

FDNY rooftop access requirements typically decide the layout before any electrical design happens, and on constrained city roofs they can decide whether the project is viable at all.

03

Much of the state outside the city uses the Unified Solar Permit, which standardises residential review and makes upstate one of the smoother markets in the northeast.

04

Ground snow load is a primary structural driver upstate and reaches some of the highest routine values in the country in the Tug Hill region.

INTERCONNECTION

New York utilities we design for

Export compensation decides how a system should be sized and whether storage belongs in the design, which makes it an engineering input rather than a sales detail.

Utility interconnection and export rules in New York
Utility Territory Export and compensation
Con Edison New York City and Westchester Net metering for residential, Value Stack for larger systems, with constrained network sections in the city
National Grid Upstate New York including Buffalo, Syracuse and Albany Net metering and Value Stack depending on system size and class
PSEG Long Island Nassau and Suffolk counties Its own interconnection process and programme terms, distinct from the upstate utilities
NYSEG and RG&E Large parts of upstate and the Finger Lakes Net metering and Value Stack, with rural feeder capacity a frequent constraint
Central Hudson Hudson Valley Net metering and Value Stack with its own application sequence

ENGINEERING CONDITIONS

What governs design in New York

These conditions decide the structural approach, the racking selection and often the layout itself. We verify them per site rather than applying a regional default.

Wind

Moderate inland, meaningfully higher on Long Island and the coastal margin

Snow

A primary design driver. Ground snow loads are substantial upstate and climb sharply in the Tug Hill and Adirondack regions

Seismic

Low to moderate, higher than most of the eastern seaboard in parts of the state

Also governing

New York City adds FDNY rooftop access requirements, parapet and setback constraints, and frequent historic district considerations

Compliance scope in New York

  • New York City Construction Codes and Fire Department rooftop access requirements
  • New York State Unified Solar Permit adopted by many municipalities outside the city
  • NYSERDA programme documentation for incentive-supported projects
  • Value Stack compensation for systems above the residential net metering threshold

New York authorities we file with

New York City Department of BuildingsCity of Buffalo Department of Permit and Inspection ServicesCity of Albany Department of BuildingsTown and village building departmentsSuffolk and Nassau town departments

Each has its own submittal route and recurring review comments. Full detail on the New York permit design page.

SAMPLE DELIVERABLES

Output from across the stack

Pages from real projects, one per discipline.

Photorealistic 3D solar design render for a commercial roof in New York Pre-design
3D pre-design. Client-facing render before engineering starts.
Three line electrical diagram from a permit plan set for a New York project Permitting
Permit design. Three line diagram with sizing, protection and rapid shutdown.
STAAD Pro load combination analysis of a solar mounting structure Engineering
Structural. STAAD Pro load combination analysis, member by member.
Aerial view of a utility scale ground mount solar installation Ground mount
Ground mount. Terrain analysis and row spacing at scale.

SOFTWARE

What we design in

Licensed, current and staffed. You do not carry the software cost or the training overhead.

PVsyst

Yield simulation and bankable production reports with full loss breakdown.

HelioScope

Rapid layout and production modelling with string level detail.

CAD

All drafting output, plan sets and construction drawings.

STAAD Pro

Structural analysis and load verification against New York wind, snow and seismic cases.

Aurora Solar

Proposal design and shade analysis, including inside your own account.

SketchUp

3D modelling for pre-design and client-facing visualisation.

ENGAGEMENT MODELS

Four ways to work with us

Per project

Send one job, pay for one job. No retainer, no minimum, no onboarding fee.

Testing our output, or occasional demand.

Named designer

One designer owns your account and learns your title block and the New York authorities you file with most.

Regular weekly volume.

Dedicated team

Agreed daily capacity with a delivery SLA, functioning as your outsourced design department.

High volume operations.

Overflow support

On call capacity alongside your existing in-house designer, absorbing peak months.

Teams that lose deals when busy.

Working with an India based partner on New York projects

We are based in Surat, Gujarat, and our New York clients are not. Our engineers work hours that overlap US time zones, so work sent at the end of your day is on your desk the next morning.

On code, the same engineers who produce CEIG approval drawings for an Indian utility also produce NEC compliant sets for US installers. Working across code frameworks daily is why New York specifics do not get lost in handoff. Work is covered by NDA and intellectual property transfers to you.

GET STARTED

Get a New York Design Services Quote

Tell us what stage you are at and what you need. No retainer, no minimum volume, and you can start with a single New York project.

  • We reply within 1 business day
  • Plan check comments handled with you
  • No obligation, no retainer to start
“Heaven Designs has been an exceptional partner for our EPC projects. Their turnaround time and design accuracy are unmatched. We have completed multiple projects with zero design rework. Highly recommended for any solar EPC company looking for reliable design support.”
Mr. Rahul Mehta , Enerture Solar
Case study: 11 MW DC tin-shed rooftop, Gulf country →

We reply within 1 business day, Mon to Sun, 8 AM to 6 PM IST. By submitting you agree to our Privacy Policy.

FAQ

New York Solar Design Services FAQs

What solar design services do you provide in New York?
Proposal design for the sales stage, permit plan sets for New York authorities, 3D pre-design and shade studies, detailed engineering for rooftop and ground mount, civil and structural engineering with STAAD Pro verification, and yield and technical reports. Most New York installers start with one service and expand once turnaround and quality are proven.
Do you understand New York code and utility requirements?
Yes, and it is the substance of the work rather than a claim. New York splits into two very different permitting worlds. New York City runs its own Department of Buildings process with filing requirements among the most demanding in the country. Much of the rest of the state has adopted a Unified Solar Permit designed to standardise and speed up residential review.
Which New York utilities do you prepare interconnection drawings for?
Con Edison, National Grid, PSEG Long Island, NYSEG and RG&E, Central Hudson. Each expects its own diagram format and documentation, and export rules differ between them, which changes both the sizing case and what the drawings must show.
What is driving solar demand in New York right now?
New York is really two markets sharing a state line. New York City is dense, expensive, administratively heavy, and dominated by flat roofs with parapets, limited access and constrained utility networks. Upstate is a snow-load and rural-feeder market where the Unified Solar Permit has genuinely reduced friction on residential work. NYSERDA programme support has sustained volume through both, and community solar has grown substantially in the upstate utility territories.
Can you handle commercial and MW-scale work in New York?
Yes. Commercial and industrial work brings structural calculations, equipment coordination and interconnection complexity. Our largest documented project is an 11 MW DC rooftop installation on tin shed structures, which required structural verification across dozens of shed roofs alongside the electrical design.
How do you quality check drawings before delivery?
A second engineer reviews every set against a jurisdiction specific checklist before it leaves us. The reviewer is not the person who drew it, because the fastest way to miss a setback error is to check your own work. Structural output is verified in STAAD Pro rather than assumed from a racking table.
Who owns the drawings and the intellectual property?
You do. Work is covered by NDA and all intellectual property in the deliverables transfers to you. We do not reuse your drawings, your customer data or your templates for anyone else.
Can we start with a single New York project?
Yes. No retainer, no minimum volume, no onboarding fee. Most clients send one project, check the output, then scale.
What structural conditions do you design for in New York?
Wind: moderate inland, meaningfully higher on Long Island and the coastal margin. Snow: a primary design driver. Ground snow loads are substantial upstate and climb sharply in the Tug Hill and Adirondack regions. Seismic: low to moderate, higher than most of the eastern seaboard in parts of the state. Also governing: new York City adds FDNY rooftop access requirements, parapet and setback constraints, and frequent historic district considerations. These decide the racking selection and attachment schedule, so we verify them per site rather than applying a regional default.
What compliance requirements apply in New York?
New York City Construction Codes and Fire Department rooftop access requirements. New York State Unified Solar Permit adopted by many municipalities outside the city. NYSERDA programme documentation for incentive-supported projects. Value Stack compensation for systems above the residential net metering threshold. We work from these rather than a national template, because each can produce a review comment on an otherwise sound design.
Which New York authorities do you work with?
New York City Department of Buildings (Five boroughs): the most demanding filing environment in the country. Filings must be made by a licensed design professional, and FDNY rooftop access rules typically govern the layout before electrical design begins. City of Buffalo Department of Permit and Inspection Services (Buffalo): upstate snow loading is the dominant structural driver, and the Unified Solar Permit pathway applies to qualifying residential work. City of Albany Department of Buildings (Albany): unified Solar Permit adopter with significant ground snow load and a share of historic building stock. Town and village building departments (Much of upstate and suburban New York): hundreds of small authorities, many using the Unified Solar Permit. Practice varies more than the standard form suggests. Suffolk and Nassau town departments (Long Island): coastal wind exposure combined with PSEG Long Island interconnection, a different combination from either the city or upstate.
What is the New York State Unified Solar Permit?
A standardised permit application adopted by many New York municipalities to speed up review of qualifying residential solar. It reduces the variation between small town and village departments considerably, which is why upstate New York is one of the smoother residential markets in the northeast despite the number of authorities involved. Local practice still varies, so we confirm the municipality actually uses it.
Why is filing in New York City so much harder?
Because filings must be made by a licensed design professional, and because FDNY rooftop access requirements, parapet conditions, and historic district overlays all constrain the layout before electrical design starts. On a dense flat roof with limited access, those requirements can reduce the viable array substantially or rule the project out. That analysis belongs at the front of the process, not at plan check.

Ready for constructible design packages?

Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.