Solar Design Services in Puerto Rico
One engineering partner across the whole project lifecycle in Puerto Rico. Proposal drawings to win the job, permit sets to get it approved, detailed engineering to get it built.
Client and engineer figures are portfolio wide across 15 countries. Installed capacity is Puerto Rico specific.
PUERTO RICO DESIGN SERVICES
Engineering capacity for the Puerto Rico market
Puerto Rico is a resilience market first and a savings market second. Nearly every residential project includes storage, and customers with direct experience of extended outages weigh backup capability heavily. Design work therefore centres on storage sizing and critical load selection alongside the array. Corrosion specification and concrete attachment detail both matter more than mainland practice would suggest.
MARKET CONTEXT
The Puerto Rico solar market
Puerto Rico has among the strongest distributed solar drivers anywhere: high electricity costs, an unreliable grid, and a population with direct experience of extended outages. Nearly every residential project is solar plus storage, and resilience rather than bill savings is often the primary motivation. The engineering is demanding: extreme hurricane wind design, genuine seismic demand, severe corrosion exposure, and predominantly concrete roof construction requiring attachment methods that differ from mainland practice.
Hurricane design wind speeds are among the highest anywhere in the United States following post-Maria code updates, and wind is the governing case.
Genuine seismic demand applies, particularly in the southwest following recent damaging earthquakes, which combined with hurricane design is an unusual pairing.
Predominantly concrete roof construction changes attachment methods fundamentally from mainland timber framing assumptions.
Grid instability makes storage effectively standard, with resilience rather than bill savings often the primary customer motivation.
THE FULL STACK
Services by project stage
Start anywhere. Most Puerto Rico clients begin with one service and expand once turnaround and quality are proven.
Sales stage
Permitting stage
Engineering stage
Rooftop detailed engineering
Construction level drawings for commercial and industrial rooftop.
Ground mount design
Layout with terrain analysis and row spacing optimisation.
Civil and structural
Foundation design, load calculations and mounting structure verification.
STAAD Pro reports
Structural analysis and calculation reports for submittal.
INTERCONNECTION
Puerto Rico utilities we design for
Export compensation decides how a system should be sized and whether storage belongs in the design, which makes it an engineering input rather than a sales detail.
| Utility | Territory | Export and compensation |
|---|---|---|
| LUMA Energy | Transmission and distribution across Puerto Rico | Net metering, with grid reliability and frequent outages making storage effectively standard on residential projects |
ENGINEERING CONDITIONS
What governs design in Puerto Rico
These conditions decide the structural approach, the racking selection and often the layout itself. We verify them per site rather than applying a regional default.
Wind
Among the highest design wind speeds anywhere in the United States, raised following post-Maria code updates. This is the governing design case
Snow
None
Seismic
Genuine and significant, particularly in the southwest following recent damaging earthquake activity
Also governing
Severe salt corrosion across the island, concrete roof construction that changes attachment methods entirely, and grid instability making storage effectively standard
Compliance scope in Puerto Rico
- Centralised single-window permitting administration rather than municipal-by-municipal filing
- Hurricane design wind speeds raised following post-Maria code updates
- Seismic design provisions reflecting recent significant seismic activity in the southwest
- Grid resilience considerations making storage effectively standard rather than optional
Puerto Rico authorities we file with
Each has its own submittal route and recurring review comments. Full detail on the Puerto Rico permit design page.
SAMPLE DELIVERABLES
Output from across the stack
Pages from real projects, one per discipline.
Pre-design
Permitting
Engineering
Ground mount SOFTWARE
What we design in
Licensed, current and staffed. You do not carry the software cost or the training overhead.
PVsyst
Yield simulation and bankable production reports with full loss breakdown.
HelioScope
Rapid layout and production modelling with string level detail.
CAD
All drafting output, plan sets and construction drawings.
STAAD Pro
Structural analysis and load verification against Puerto Rico wind, snow and seismic cases.
Aurora Solar
Proposal design and shade analysis, including inside your own account.
SketchUp
3D modelling for pre-design and client-facing visualisation.
ENGAGEMENT MODELS
Four ways to work with us
Per project
Send one job, pay for one job. No retainer, no minimum, no onboarding fee.
Testing our output, or occasional demand.
Named designer
One designer owns your account and learns your title block and the Puerto Rico authorities you file with most.
Regular weekly volume.
Dedicated team
Agreed daily capacity with a delivery SLA, functioning as your outsourced design department.
High volume operations.
Overflow support
On call capacity alongside your existing in-house designer, absorbing peak months.
Teams that lose deals when busy.
Working with an India based partner on Puerto Rico projects
We are based in Surat, Gujarat, and our Puerto Rico clients are not. Our engineers work hours that overlap US time zones, so work sent at the end of your day is on your desk the next morning.
On code, the same engineers who produce CEIG approval drawings for an Indian utility also produce NEC compliant sets for US installers. Working across code frameworks daily is why Puerto Rico specifics do not get lost in handoff. Work is covered by NDA and intellectual property transfers to you.
GET STARTED
Get a Puerto Rico Design Services Quote
Tell us what stage you are at and what you need. No retainer, no minimum volume, and you can start with a single Puerto Rico project.
- We reply within 1 business day
- Plan check comments handled with you
- No obligation, no retainer to start
“Heaven Designs has been an exceptional partner for our EPC projects. Their turnaround time and design accuracy are unmatched. We have completed multiple projects with zero design rework. Highly recommended for any solar EPC company looking for reliable design support.”
Prefer to talk first?
FAQ
Puerto Rico Solar Design Services FAQs
What solar design services do you provide in Puerto Rico?
Do you understand Puerto Rico code and utility requirements?
Which Puerto Rico utilities do you prepare interconnection drawings for?
What is driving solar demand in Puerto Rico right now?
Can you handle commercial and MW-scale work in Puerto Rico?
How do you quality check drawings before delivery?
Who owns the drawings and the intellectual property?
Can we start with a single Puerto Rico project?
What structural conditions do you design for in Puerto Rico?
What compliance requirements apply in Puerto Rico?
Which Puerto Rico authorities do you work with?
Why is storage standard rather than optional in Puerto Rico?
How high are Puerto Rico design wind speeds?
Ready for constructible design packages?
Solar engineering for EPCs. MEP design and BIM for AEC teams. Reply within 1 business day.